Notices · Solicitation
New Mexico Forest Engineering and Road Maintenance (FERM)
Open. Responses are due in 430 days, on January 31, 2028, 7:30 PM ET.
| Solicitation number | 12363N22Q4000 |
|---|---|
| Notice type | Solicitation |
| Agency | AGRICULTURE, DEPARTMENT OF, FOREST SERVICE, USDA-FS, STEWARDSHIP CONTRACTING BRANCH |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 237310 Highway, Street, and Bridge Construction SBA size standard: $45M average annual receipts |
| Product or service code | Y1LB Construction of Highways, Roads, Streets, Bridges, and Railways |
| Place of performance | Santa Fe, NM 87501, USA |
| Posted | January 14, 2026 |
| Response due | January 31, 2028, 7:30 PM ET |
Who holds the work now
Largest current award in NAICS 237310 at the Forest Service, by dollars obligated: KIEWIT INFRASTRUCTURE SOUTH CO, current end date March 31, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 12363N22Q4000 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
From the attachments
Pulled by AI from 8 of 11 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.
| Evaluation | tradeoff (factors other than price can outweigh price) Revised NM FERM Quote Package.pdf, page 8: "Award will be made to that offeror (1) whose proposal is technically acceptable and (2) whose technical/price relationship is the most advantageous to the Government." |
|---|---|
| Evaluation | best value Revised NM FERM Quote Package.pdf, page 2: "The unit pricing requested will be utilized for price evaluation purposes in selecting a “Best Value” contractor." |
| Evaluation | lowest price technically acceptable Final NM FERM BPA.pdf, page 34: "a PASS/FAIL technical evaluation in line with lowest price technically acceptable (LPTA) will be the preferred method of evaluation." |
| Evaluation factors | Relevant Past Performance, Equipment Availability, Biobased/BioPreferred, in descending order of im… Revised NM FERM Quote Package.pdf, page 7: "(1) Relevant Past Performance, (2) Equipment Availability, and (3) Biobased/BioPreferred." |
| Evaluation factors | (1) Relevant Past Performance, (2) Equipment Availability, (3) Biobased/BioPreferred Final NM FERM BPA.pdf, page 42: "the following technical factors are in descending order of importance whereby each factor is more important than the next: (1) Relevant Past Performance, (2) Equipment Availability, and (3) Biobased/BioPreferred." |
| Evaluation factors | Relevant Past Performance; Equipment Availability; Biobased/BioPreferred Final NM FERM Quote Package.pdf, page 7: "the following technical factors are in descending order of importance whereby each factor is more important than the next: (1) Relevant Past Performance, (2) Equipment Availability, and (3) Biobased/BioPreferred." |
| Questions due | November 21, 2022 Amendment 01.pdf, page 1: "Pre-Bid Inquiries (PBI’s) for Contract Bidding (LAST DAY TO SUBMIT NOVEMBER 21, 2022)" |
| Bonding | Individual orders will identify relevant bonding requirements Final NM FERM BPA.pdf, page 30: "Individual Orders will identify relevant bonding requirements per Federal Acquisition Regulation Part 28-102-1." |
| Past performance | Past performance information for the firm and any proposed major subcontractor performing more than… Revised NM FERM Quote Package.pdf, page 6: "Offerors shall submit past performance information for their firm and any proposed major subcontractors performing more than 20% of the work." |
| Past performance | Past performance information for the firm and any proposed major subcontractors performing more tha… Final NM FERM BPA.pdf, page 41: "Offerors shall submit past performance information for their firm and any proposed major subcontractors performing more than 20% of the work." |
| Past performance | information for each reference and each Pay Item completed during the past three years and all cont… Final NM FERM Quote Package.pdf, page 6: "that must have been completed during the past three years and all contracts and subcontracts in progress." |
| Past performance | 1 more in the files, not shown here. |
| Contract type | firm-fixed-price Revised NM FERM Quote Package.pdf, page 2: "The general activities used for future call orders will generally be a firm fixed price service." |
| Contract type | blanket purchase agreement (BPA) Revised NM FERM Quote Package.pdf, page 1: "Award under this solicitation will be made through issuance of multiple Blanket Purchase Agreements." |
The notice text
The text below is SAM.gov's own, unedited.
Attachments
The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.
- 840-2 INSTALL.pdf
- 840-2 DRAWING.pdf
- WageDeterminationHighway-Construction.pdf
- Road Maintenance Specifications.pdf
- Revised NM FERM Quote Package.pdf
- Amendment 01.pdf
- Final NM FERM BPA.pdf
- Fire Plan.pdf
- Final NM FERM Quote Package.pdf
- E__PSR-REVIEW_C-GROUP 3 G3-4 EARTHEN BARRIER G3-4 (1).pdf
- WageDetermination-Service.pdf
- Award Notice for SAM R1.pdf
- Amendment 2.pdf
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | October 27, 2022 | November 30, 2022, 7:30 PM ET |
| Solicitation | November 16, 2022 | November 30, 2022, 7:30 PM ET |
| Solicitation | February 8, 2023 | November 30, 2022, 7:30 PM ET |
| Solicitation | February 12, 2023 | February 13, 2028, 7:30 PM ET |
| Solicitation | November 5, 2023 | January 31, 2028, 7:30 PM ET |
| Solicitation | November 5, 2023 | January 31, 2028, 7:30 PM ET |
| Solicitation | February 5, 2024 | January 31, 2028, 7:30 PM ET |
| Solicitation | April 10, 2025 | January 31, 2028, 7:30 PM ET |
| Solicitation | January 14, 2026 | January 31, 2028, 7:30 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.