Notices · Combined Synopsis/Solicitation
Tonasket Ranger Station HVAC Replacement Building 2007
Open. Responses are due in 6 days, on December 3, 2026, 8:00 PM ET.
| Solicitation number | 1240BJ27Q0006 |
|---|---|
| Notice type | Combined Synopsis/Solicitation |
| Agency | AGRICULTURE, DEPARTMENT OF, FOREST SERVICE, USDA FOREST SERVICE |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 238220 Plumbing, Heating, and Air‑Conditioning Contractors SBA size standard: $19M average annual receipts |
| Product or service code | J045 Maint/Repair/Rebuild of Equipment- Plumbing, Heating, and Waste Disposal Equipment |
| Place of performance | Tonasket, WA 98855, USA |
| Posted | November 4, 2026 |
| Response due | December 3, 2026, 8:00 PM ET |
Who holds the work now
Largest current award in NAICS 238220 at the Forest Service, by dollars obligated: CARVER CONSTRUCTION, LLC, current end date December 31, 2026. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 1240BJ27Q0006 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
From the attachments
Pulled by AI from all 6 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.
| Evaluation | tradeoff (factors other than price can outweigh price) C04_1_RFQ_1240BJ27Q0006.pdf, page 34: "The Contracting Officer may issue an award to other than the quoter with the lowest priced quotation." |
|---|---|
| Site visit | optional C04_1_RFQ_1240BJ27Q0006.pdf, page 32: "Site visits may be arranged during normal work hours by contacting:" |
| Bonding | A Bid Bond (20%) will be required of a quoter whose total priced quote exceeds $150,000. C04_1_RFQ_1240BJ27Q0006.pdf, page 6: "A Bid Bond (20%) will be required of a quoter whose total priced quote exceeds $150,000." |
| Bonding | Payment Bond (100%) will be required of awardee for an award between $35,000 and $150,000. C04_1_RFQ_1240BJ27Q0006.pdf, page 6: "Payment Bond (100%) will be required of awardee for an award between $35,000 and $150,000." |
| Bonding | Performance and Payment Bonds (100% each) will be required of awardee for an award greater than $15… C04_1_RFQ_1240BJ27Q0006.pdf, page 6: "Performance and Payment Bonds (100% each) will be required of awardee for an award greater than $150,000." |
| Past performance | minimum of five previous projects similar in nature, size, and extent to this Project C04_2_Attachment 3 RS HVAC Specifications.pdf, page 38: "having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project" |
| Past performance | Manufacturer with minimum twenty years' documented experience C04_2_Attachment 3 RS HVAC Specifications.pdf, page 94: "A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum twenty years' documented experience." |
| Past performance | Installer with minimum five years' documented experience C04_2_Attachment 3 RS HVAC Specifications.pdf, page 94: "B. Installer: Company specializing in performing Work of this section with minimum five years' documented experience." |
| Past performance | 1 more in the files, not shown here. |
| Contract type | firm-fixed-price C04_1_RFQ_1240BJ27Q0006.pdf, page 6: "The purpose of this firm-fixed price contract is for the removal, upgrading, and replacement" |
The notice text
The text below is SAM.gov's own, unedited.
Attachments
The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.
- C04_4_BidBondSF24.pdf
- C04_2_Attachment 4 Construction Wage Determination.pdf
- C04_2_Attachment 3 RS HVAC Specifications.pdf
- C04_2_Attachment 2 RS Floorplan HVAC Locate.pdf
- C04_2_Attachment 1 SOW Appendices.pdf
- C04_3_Quote Template.docx
- C04_1_RFQ_1240BJ27Q0006.pdf
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Combined Synopsis/Solicitation | November 3, 2026 | December 3, 2026, 8:00 PM ET |
| Combined Synopsis/Solicitation | November 4, 2026 | December 3, 2026, 8:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.