Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Combined Synopsis/Solicitation

Cripple Creek Veg Management Roads Reconstruction

Open. Responses are due in 7 days, on December 4, 2026, 8:00 PM ET.

Solicitation number1240BJ27Q0009
Notice typeCombined Synopsis/Solicitation
AgencyAGRICULTURE, DEPARTMENT OF, FOREST SERVICE, USDA-FS, CSA NORTHWEST 7
Set-asideSmall Business Set Aside - Total (SBA)
NAICS237310 Highway, Street, and Bridge Construction
SBA size standard: $45M average annual receipts
Product or service codeZ2LB Repair or Alteration of Highways/Roads/Streets/Bridges/Railways
Place of performanceAnchorage, AK 99501, USA
PostedNovember 22, 2026
Response dueDecember 4, 2026, 8:00 PM ET

Who holds the work now

Largest current award in NAICS 237310 at the Forest Service, by dollars obligated: KIEWIT INFRASTRUCTURE SOUTH CO, current end date March 31, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 1240BJ27Q0009 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from all 6 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationlowest price
1240BJ27Q0009.pdf, page 24: "Award will be based on price. The Government will offer an order (contract) to the responsible (FAR subpart 9.1) quoter with a reasonable price (FAR 15.404-1(b))."
Evaluation factorsPrice (award will be based on price)
1240BJ27Q0009.pdf, page 24: "Award will be based on price. The Government will offer an order (contract) to the responsible (FAR subpart 9.1) quoter with a reasonable price"
Questions dueNovember 20, 2026, 12:00 PM Pacific Time
1240BJ27Q0009.pdf, page 24: "are due no later than November 20th, 2026 at 12:00 PM Pacific Time. This will ensure enough time to respond"
Questions dueNovember 20, 2026
Amendment 00001 - 1240BJ27Q0009.pdf, page 1: "post the questions answered that came in via email by the due date of 11/20/2026."
Site visitoptional
1240BJ27Q0009.pdf, page 22: "Site visits may be arranged during normal duty hours by contacting:"
Contract typefirm-fixed-price
1240BJ27Q0009.pdf, page 22: "It is anticipated that a Firm-Fixed Price purchase order (contract) will be awarded as a result of this synopsis/solicitation."

The notice text

The text below is SAM.gov's own, unedited.

Cripple Creek Veg Management Roads Reconstruction CHUGACH NF This project includes subgrade construction, unsuitable material excavation and endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing and grubbing,disposal site contouring, switchback realignment, waterbar construction and reconstruction,and all other work required to get these roads to a condition to place aggregate surface materials. Option item is road surfacing. Questions Due:11/20 Proposals due: 12/04/2026 1700 PT Amendment POSTED 11/23/2026 with Q&A

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationNovember 9, 2026December 4, 2026, 8:00 PM ET
Combined Synopsis/SolicitationNovember 22, 2026December 4, 2026, 8:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.