Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Combined Synopsis/Solicitation

GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest

Open. Responses are due in 14 days, on December 11, 2026, 8:00 PM ET.

Solicitation number1240LU27Q0001
Notice typeCombined Synopsis/Solicitation
AgencyAGRICULTURE, DEPARTMENT OF, FOREST SERVICE, USDA-FS, CSA INTERMOUNTAIN 9
Set-asideSmall Business Set Aside - Total (SBA)
NAICS236118 Residential Remodelers
SBA size standard: $45M average annual receipts
Product or service codeY1FA Construction of Family Housing Facilities
Place of performanceKamiah, ID, USA
PostedNovember 22, 2026
Response dueDecember 11, 2026, 8:00 PM ET

Who holds the work now

Largest current award in NAICS 236118 at the Forest Service, by dollars obligated: VERITAS FACILITY SERVICES AND CONSTRUCTION, INC, current end date December 16, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 1240LU27Q0001 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from all 7 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationbest value
C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 19: "Award will be made to the Contractor representing the best value to the Government."
Questions dueNovember 3, 2026, 5:00 p.m. PDT
C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 24: "Inquiries may be emailed to Contract Specialist at Judith.martin@usda.gov no later than November 3, 2026 5:00 p.m. PDT."
Site visitmandatory
C04 Attachment 3 - Specifications Powell Duplex.pdf, page 119: "Prior to submitting bid, Contractor shall visit site of proposed work and familiarize himself with conditions affecting work."
Site visitOctober 28, 2026
C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 21: "(a) A Microsoft Teams Pre-Quote Meeting: October 28, 2026 @ 2:00 p.m. PDT."
Site visitsee the quote
C05 Amendment 02 Powell Duplex.pdf, page 4: "Q13: Site visit information: Could the Government share any roof measurements, photos, or notes collected during the October 29 site visit?"
Bonding20% bid guarantee (SF-24 bid bond) if quote is over $150,000
C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 1: "Bid Guarantee (FAR 52.228-1): 20% required if quote is in excess of $150,000."
BondingPerformance and payment bonds (FAR 52.228-15)
C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 11: "52.228-15 Performance and Payment Bonds-Construction (Jun 2020)"
Past performanceApplicator with minimum 5 years experience
C04 Attachment 3 - Specifications Powell Duplex.pdf, page 88: "A. Applicator Qualifications: Company specializing in performing the type of work specified with minimum 5 years experience."
Past performanceFabricator and installer with 1 years of documented experience in sheet metal work
C04 Attachment 3 - Specifications Powell Duplex.pdf, page 55: "C. Fabricator and Installer Qualifications: Company specializing in sheet metal work with 1 years of documented experience."
Past performanceManufacturer with not less than three years of documented experience
C04 Attachment 3 - Specifications Powell Duplex.pdf, page 62: "A. Manufacturer Qualifications: Company specializing in manufacturing products of the type specified in this section, with not less than three years of documented experience."
Past performance1 more in the files, not shown here.
Contract typefirm-fixed-price
C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 19: "This solicitation and any resulting contract is a firm-fixed price commercial construction type of contract."

The notice text

The text below is SAM.gov's own, unedited.

This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. Solicitation number 1240LU27Q0001 is issued as a Request for Quotation (RFQ) for the Powell Duplex Improvements on the Nez Perce – Clearwater National Forest. The project consists of removing and replacing the existing roof(s), water damaged Structurally Insulated Panels (SIP), some structural members in the roof and walls of an existing residential duplex. The existing demolished materials shall be disposed of off Forest Service lands in accordance with all State and federal laws. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 236118. The small business size standard is $45 Million. This acquisition is a total Small Business set-aside. All responsible sources may submit a quotation which will be considered by the agency. Amendment 01 - Summary: Due date for quotes is extended. Period of Performance is changed. Amendment 02 - Summary: Due date for quotes is extended, Questions/Answers, Photos of Duplex.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationOctober 13, 2026November 13, 2026, 7:00 PM ET
Combined Synopsis/SolicitationNovember 9, 2026December 1, 2026, 8:00 PM ET
Combined Synopsis/SolicitationNovember 22, 2026December 11, 2026, 8:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.