Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Combined Synopsis/Solicitation

USDA Design/Build Perimeter Security Enhancement Parking Lot 9

Open. Responses are due in 40 days, on January 6, 2027, 2:00 PM ET.

Solicitation number124PCA27Q0002
Notice typeCombined Synopsis/Solicitation
AgencyAGRICULTURE, DEPARTMENT OF, USDA, DEPARTMENTAL ADMINISTRATION, USDA, OCP-POD-ACQ-MGMT-BRANCH-FTC
Set-asideNone (full and open competition)
NAICS237310 Highway, Street, and Bridge Construction
SBA size standard: $45M average annual receipts
Product or service codeZ2LZ Repair or Alteration of Parking Facilities
Place of performanceWashington, DC 20250, USA
PostedNovember 18, 2026
Response dueJanuary 6, 2027, 2:00 PM ET

Who holds the work now

This notice names no contract we hold.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 124PCA27Q0002 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from all 8 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationtradeoff (factors other than price can outweigh price)
INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf, page 20: "Award will be made to the offeror who is determined the Best Value to the government."
Evaluation factorsTransmittal Cover Letter and Required Documents; Technical Understanding and Capabilities; Prior Ex…
INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf, page 8: "(1) Factor 1 - Transmittal Cover Letter and Required Documents; (2) Factor 2 - Technical Understanding and Capabilities;"
Questions dueDecember 9, 2026, 2:00PM (EST)
INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf, page 3: "The deadline for submitting questions is no later than Wednesday December 9, 2026, 2:00PM (EST)."
Site visitmandatory
Attachment 1 SOW Lot 9 11.19.2026.pdf, page 2: "Prospective bidders will be required to visit the site to acquire firsthand knowledge of site conditions"
Site visitDecember 2, 2026, mandatory
INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf, page 2: "Site Visit Wednesday December 02, 2026, 10:30AM (EST)"
ClearanceHSPD-12 security clearance
Attachment 13 USDA Whitten 100pct Spec Submission R2 04.16.…, page 22: "An HSPD-12 security clearance is required to access ePM."
Clearancesecurity regulations imposed by the occupying agency including any necessary clearances required fo…
Attachment 13 USDA Whitten 100pct Spec Submission R2 04.16.…, page 96: "comply with security regulations imposed by the occupying agency including any necessary clearances required for access to occupied areas."
BondingPerformance and Payment Bonds, equal to 100% of contract price
INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf, page 6: "Performance and Payment Bonds are required equal to 100% of contract price. Bonds shall be furnished within 14 calendar days of contract award."
Past performanceup to three (3) projects performed within the past five (5) years
INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf, page 12: "The Offeror shall submit up to three (3) projects performed within the past five (5) years from the RFQ release date"
Past performancePast performance of design-build contracts
INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf, page 13: "Past Performance will be evaluated to assess the Government's confidence in the Offeror's ability to successfully perform the design-build requirements of this solicitation."
Past performanceTree service firm experience
Attachment 13 USDA Whitten 100pct Spec Submission R2 04.16.…, page 90: "An experienced tree service firm that has successfully completed temporary tree and plant protection work similar to that required for this Project"
Past performance2 more in the files, not shown here.
Contract typefirm-fixed-price
INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf, page 19: "The Offeror shall provide a Firm Fixed-Price for a turn-key project completion in an 11.5 months"

The notice text

The text below is SAM.gov's own, unedited.

The site visit will be held on Wednesday, December 2, 2026, at 10:30 a.m. Eastern Standard Time (EST). Quoters who do not attend the mandatory site visit will be non-responsive offerors. USDA requires a Design/Build contractor to complete the rehabilitation of Parking Lot 9 at the Jamie L. Whitten Building in Washington, DC. The project includes perimeter security upgrades, parking lot resurfacing, sinkhole remediation, electrical work, and landscaping, and is a key component of a larger effort to establish Level IV security protection around the facility. The contractor must assess and update incomplete 2021 construction documents, verify the suitability of security materials already stored on site, and coordinate closely with WMATA due to the Orange, Blue, and Silver Metro lines running beneath the parking lot. After construction began in 2024, sinkholes developed near a WMATA elevator, halting work; therefore, the contractor must determine the full extent of subsurface issues and implement a remediation plan approved by both USDA and WMATA, incorporating recommendations from Langan’s geotechnical investigation. With historic preservation approvals already secured and no work-hour restrictions in place, the project’s objective is to restore progress on the halted construction and deliver the required Level IV perimeter security enhancements within eleven and a half months of Notice to Proceed (NTP) issuance.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationNovember 18, 2026January 6, 2027, 2:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.