Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Combined Synopsis/Solicitation

Forest Service - Solar Batteries Frenchman Work Center

Open. Responses are due in 8 hours, on November 27, 2026, 7:00 PM ET.

Solicitation number127EAW27Q0002
Notice typeCombined Synopsis/Solicitation
AgencyAGRICULTURE, DEPARTMENT OF, FOREST SERVICE, USDA-FS, CSA SOUTHWEST 6
Set-asideSmall Business Set Aside - Total (SBA)
NAICS238210 Electrical Contractors and Other Wiring Installation Contractors
SBA size standard: $19M average annual receipts
Product or service codeN061 Installation of Equipment: Electric Wire, and Power and Distribution Equipment
Place of performanceCA, USA
PostedNovember 16, 2026
Response dueNovember 27, 2026, 7:00 PM ET

Who holds the work now

Largest current award in NAICS 238210 at the Forest Service, by dollars obligated: ECO ENERGY SOLUTIONS, INC., current end date September 10, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 127EAW27Q0002 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from 8 of 10 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationhighest technically rated
C04 - Attachment 1 - Solicitation - 127EAW27Q0002 - Solar B…, page 14: "Award will be made to the offeror whose quote is determined to be the highest technically rated, provided that:"
Evaluation factorsPast Performance, rated acceptable, neutral or unacceptable
C05 - Amendment A00001 - 127EAW27Q0002 - Solar Batteries Fr…, page 4: "Past Performance is rated as acceptable, neutral or unacceptable."
Questions dueNovember 13, 2026, 11:00 AM Pacific Time
C04 - Attachment 1 - Solicitation - 127EAW27Q0002 - Solar B…, page 10: "Questions shall be submitted via email to Tanya.Torres@usda.gov and are due no later than November 13, 2026, at 11:00 AM Pacific Time."
BondingAlternate payment protection (such as a 100% payment bond via SF-25A or a 100% deposit) required up…
C05 - Amendment A00001 - 127EAW27Q0002 - Solar Batteries Fr…, page 2: "alternate payment protection (such as a 100% payment bond via SF-25A or a 100% deposit) is required upon award for quotes of $35,000.00 or more."
BondingAlternate payment protection required upon award for quotes of $35,000.00 or more
C05 - Amendment A00002 - 127EAW27Q0002 - Solar Batteries Fr…, page 2: "but alternate payment protection (such as a 100% payment bond via SF-25A or a 100% deposit) is required upon award for quotes of $35,000.00 or more."
BondingBid Bond/Guarantee
C04 - Attachment 3. Schedule Of Items.docx: "Bid Bond/Guarantee. REQUIRED for proposals exceeding $150,000.00 IAW FAR 52.228-1 Bid Guarantee."
Past performanceThree (3) projects of similar magnitude completed by the firm within the last three (3) years
C04 - Attachment 1 - Solicitation - 127EAW27Q0002 - Solar B…, page 12: "Furnish a list of three (3) projects of similar magnitude completed by the firm within the last three (3) years."
Past performanceThree projects of similar magnitude completed by the firm within the last three years
C05 - Amendment A00001 - 127EAW27Q0002 - Solar Batteries Fr…, page 4: "Furnish a list of three (3) projects of similar magnitude completed by the firm within the last three (3) years."
Contract typefirm-fixed-price
C04 - Attachment 1 - Solicitation - 127EAW27Q0002 - Solar B…, page 10: "It is anticipated that a Firm Fixed Price will be awarded as a result of this synopsis/solicitation."

The notice text

The text below is SAM.gov's own, unedited.

Date 11/17/2026 Amendment A00002 is posted. Contractors are required to acknowledge Amendment A00002. Please see the attachments for further information. --------------------------- Date 11/13/2026 Amendment A00001 is posted. Contractors are required to acknowledge Amendment A00001. Please see the attachments for further information. --------------------------- Solar Batteries Frenchman Work Center 127EAW27Q0002 Plumas National Forest This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAW27Q0002 is issued as a Request for Quotation (RFQ) for the Solar Batteries Frenchman Work Center project at Plumas National Forest, California. The goal of this project is to replace the existing batteries in the Frenchman Work Center Solar System and recycle the old batteries. The applicable North American Industry Classification Standard Code is 238210 - Electrical Contractors and Other Wiring Installation Contractors. The small business size standard is $19 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Disclosure of Magnitude of the Construction Project: Between $25,000 and $100,000 See all attachments for additional information. IMPORTANT NOTES: An organized site visit will not be held. In no event shall failure to inspect the site constitute grounds for a claim after award.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationNovember 4, 2026November 20, 2026, 2:00 PM ET
Combined Synopsis/SolicitationNovember 12, 2026November 20, 2026, 2:00 PM ET
Combined Synopsis/SolicitationNovember 16, 2026November 27, 2026, 7:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.