Notices · Sources Sought
Site Visit - Removal of Old Fluid Cell
Open. Responses are due in 13 days, on December 10, 2026, 4:00 PM ET.
| Solicitation number | 82247 |
|---|---|
| Notice type | Sources Sought |
| Agency | DEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA8571 MAINT CONTRACTING AFSC PZIM |
| Set-aside | Not listed |
| NAICS | Not listed |
| Product or service code | Not listed |
| Place of performance | Warner Robins, GA 31098, USA |
| Posted | October 19, 2026 |
| Response due | December 10, 2026, 4:00 PM ET |
Who holds the work now
This notice names no contract we hold.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 82247 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The Contractor shall provide to the Maintenance Support Group (MXSG) all the tools, parts, materials, equipment, labor, and transportation necessary to decommission, remove, and dispose of one (1) Quintus ABB QFC 1.6 x 4-1400 fluid cell press. The equipment is located in building 140 at Robins Air Force Base (AFB), Georgia. Decommissioning services shall include dismantling, rigging, relocating the components to a designated on-base cutting site, reduction of major components to recyclable sizes, and hauling all resulting scrap and debris off Robins AFB. Upper Filler Piece: 64,000 lbs; Pressure Plate: 32,000 lbs; Lower Filler Piece: 86,000 lbs; Unwound Main Cylinder: 148,000 lbs; Plating attached to Lower Filler: 7,000 lbs (see Performance Work Statement for full details)
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Sources Sought | October 19, 2026 | December 10, 2026, 4:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.