Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Sources Sought

EMU Electric Modernization Upgrade

Open. Responses are due in 18 days, on December 15, 2026, 7:00 PM ET.

Solicitation numberBAA-N6893625S0001-0001
Notice typeSources Sought
AgencyDEPT OF DEFENSE, DEPT OF THE NAVY, NAVAL AIR WARFARE CENTER
Set-asideNot listed
NAICS541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
SBA size standard: 1,000 employees (SBA footnote 11); exception for Aircraft, Aircraft Engine and Engine Parts: 1,500 employees (SBA footnote 11); exception for Other Aircraft Parts and Auxiliary Equipment: 1,250 employees (SBA footnote 11); exception for Guided Missiles and Space Vehicles, Their Propulsion Units and Propulsion Parts: 1,300 employees (SBA footnote 11)
Product or service codeAC13 National Defense R&D Services; Department of Defense - Military; Experimental Development
Place of performanceNot listed
PostedNovember 23, 2026
Response dueDecember 15, 2026, 7:00 PM ET

Who holds the work now

Largest current award in NAICS 541715 at the Department of the Navy, by dollars obligated: FLUOR MARINE PROPULSION, LLC, current end date September 30, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read BAA-N6893625S0001-0001 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The Naval Air Warfare Center Weapons Division (NAWCWD) has developed and intends to field a modular, organic capability consisting of commercial-off-the-shelf (COTS) components integrated into custom hardware for the MH-60R Seahawk helicopter. The Government has established a viable system baseline, however, a standardized, repeatable, and supportable production, deployment, and sustainment process is not yet developed. With an initial operational capability target of Q1 FY2028, the program's small scope makes traditional, large-scale support and depot-level sustainment models highly cost-prohibitive. The current ad-hoc model lacks a process with defined material flow, supply-chain management, quality control, and software deployment process. Consequently, ongoing assembly and support practices require excessive time and specialized personnel that a small team cannot realistically maintain. Furthermore, the existing packaging is not optimized for rapid global air transport, and the chassis design needs human factors optimization for installation and removal in shipboard and austere environments. As a result, these cumulative limitations reduce overall operational availability, increase the burden on forward-deployed personnel, and raise long-term lifecycle costs. This delays the Navy's critical ability to rapidly produce, transport, install, and sustain this capability worldwide. Desired Outcomes & Constraints (Submissions may be for one or all requirements) Process Design: Production Process: An operational, production-representative process capable of producing a defined pilot lot using controlled material, assembly, programming, inspection, test, configuration-management, packaging, and acceptance processes that is executable by a small team. Deployment Process: A lightweight, practical support process that enables a small team to provision and deploy the capability with minimal specialized infrastructure. Sustainment Process: A lightweight, practical support process that enables a small team to support, maintain, repair, reconfigure, and reconstitute the capability with minimal specialized infrastructure. Packaging Plan: A rugged, efficient, and reusable packaging plan compatible with Joint Modular Intermodal Containers, Pelican cases, or comparable solutions that enable rapid global air transport and protect the system and associated components during storage, shipment, and operational movement. Human Factors Optimization. The project seeks modified chassis, mounts, and installation/removal processes that reduce the time, tools, personnel, and specialized equipment required to install and uninstall the system in shipboard and austere field environments. Questions: Questions should be submitted per the Submission Guidelines section (below), no later than 1600 EST (4:00 PM Eastern Standard Time) by November 09, 2026. Submission Guidelines, Evaluation, and Eligibility Requirements: Refer to BAA N6893625S0001 (https://sam.gov/workspace/contract/opp/54d124889d3f423fa900e43c4b041026/view) posted on SAM.gov for submission guidelines and evaluation. While the BAA is an open announcement, the Government is requesting responses for this problem by 1600 EST (4:00 PM Eastern Standard Time) December 15, 2026. Required Submission Changes: When submitting the response, the cover page must specifically reference N6893625S0001-0001, CAGE Code and the Joint Certification Program (JCP) Point of Contact email to be considered.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Sources SoughtOctober 27, 2026December 1, 2026, 7:00 PM ET
Sources SoughtOctober 27, 2026December 1, 2026, 7:00 PM ET
Sources SoughtNovember 2, 2026December 1, 2026, 7:00 PM ET
Sources SoughtNovember 2, 2026December 1, 2026, 7:00 PM ET
Sources SoughtNovember 23, 2026December 15, 2026, 7:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.