Notices · Combined Synopsis/Solicitation
Replace DFAC Walk-in Refrigerators & Freezer
Closed. Responses were due September 17, 2019, 7:00 PM ET.
| Solicitation number | FA2517-19-Q-A044 |
|---|---|
| Notice type | Combined Synopsis/Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA2517 21 CONS BLDG 350 |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 333415 Air‑Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing SBA size standard: 1,250 employees |
| Product or service code | 41 Refrig, Air Condit/Circulat Eqpt |
| Place of performance | Peterson AFB, CO 80914, USA |
| Posted | September 12, 2019 |
| Response due | September 17, 2019, 7:00 PM ET |
Who holds the work now
Largest current award in NAICS 333415 at the Department of the Air Force, by dollars obligated: JT WEST CONSTRUCTION, INC., current end date April 30, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read FA2517-19-Q-A044 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The Contractor shall furnish all plant, labor, travel, material, tools and supervision to replace four (4) walk-in refrigerators and one (1) freezer at Aragon Dining Facility, Peterson AFB, CO, in accordance with the solicitation and the revised Statement of Work dated 5 September 2019. Amendment 1 adds the following verbiage to the SOW: NOTE: THE EXISTING COMMERCIAL GRADE REFRIGERATION SYSTEM THAT POWERS/SUPPORTS WALK-IN REFRIGERATOR BOXES AND WALK-IN FREEZER BOX WILL NOT BE REPLACED. HOWEVER, IN THE PROCESS OF REPLACING THE WALK-IN REFRIGERATOR BOXES AND THE WALK-IN FREEZER BOX, THE CONTRACTOR MAY BE REQUIRED TO UNINSTALL AND THEN REINSTALL THE CURRENT REFRIGERATION SYSTEM. Amendment 2 changes the following: 1. Corrects the date of associated SOW in RFQ. 2. Incorporates Attachment #2 - DFAC Walk-in Refrigerators & Freezer Q&A Amendment 3 changes verbiage in the SOW. 1. The word "INSTALL" is changed to "CONNECT". Thus, the verbiage will hereby read: HOWEVER, IN THE PROCESS OF REPLACING THE WALK-IN REFRIGERATOR BOXES AND THE WALK-IN FREEZER BOX, THE CONTRACTOR MAY BE REQUIRED TO DISCONNECT AND THEN RECONNECT THE CURRENT REFRIGERATION SYSTEM. 2. Corrects the date of associated SOW in RFQ. Amendment 4 changes the following: 1. Response date is changed from Wednesday, 11 September 2019, 4:00 P.M. MST to Monday, 16 September 2019, 4:00 P.M. MST. Amendment 5 changes the following: 1. Revised SOW dated 13 September 2019 is incorporated into RFQ. 2. Adds Cooler/Evaporator unit with solenoid information for each walk-in box. 3. Changes response date to Tuesday, 17 September 2019, 4:00 P.M. MST.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Combined Synopsis/Solicitation | September 4, 2019 | September 11, 2019, 7:00 PM ET |
| Combined Synopsis/Solicitation | September 6, 2019 | September 11, 2019, 7:00 PM ET |
| Combined Synopsis/Solicitation | September 8, 2019 | September 11, 2019, 7:00 PM ET |
| Combined Synopsis/Solicitation | September 9, 2019 | September 16, 2019, 7:00 PM ET |
| Combined Synopsis/Solicitation | September 12, 2019 | September 17, 2019, 7:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.