Notices · Sources Sought
Roof Snow Block
Open. Responses are due in 4 hours, on November 27, 2026, 5:00 PM ET.
| Solicitation number | FA446027Q0004 |
|---|---|
| Notice type | Sources Sought |
| Agency | DEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA4460 19 CONS PKA |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 332322 Sheet Metal Work Manufacturing SBA size standard: 500 employees |
| Product or service code | 5650 Roofing and Siding Materials |
| Place of performance | Little Rock Air Force Base, AR 72099, USA |
| Posted | November 19, 2026 |
| Response due | November 27, 2026, 5:00 PM ET |
Who holds the work now
USAspending shows no current award in NAICS 332322 at the Department of the Air Force, and this notice names no contract we hold.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read FA446027Q0004 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
This acquisition is a new requirement for the procurement of an engineered, continuous pipe or fence-style rail snow retention system for facility roof installation. System Configuration: Must be a continuous horizontal pipe- or fence-style rail snow retention system capable of bridging across structural roof panels and providing continuous longitudinal perimeter retention. Retention Capacity & Coverage: System must furnish 720 linear feet of continuous perimeter retention coverage. Substrate Compatibility: Mounting clamps and hardware must be fully compatible with the host metal roofing profile (e.g., standing seam or exposed fastener). Attachment systems for standing-seam profiles must utilize non-penetrating clamping mechanisms to preserve the weather-tight integrity and manufacturer warranty of the roof panels. Structural Performance Thresholds: System components (brackets, clamps, rails, and fasteners) must be engineered and rated to resist site-specific snowpack and ice accumulation shear loads without permanent mechanical deflection. Clamp-to-seam holding strength must meet or exceed minimum structural thresholds (e.g., capable of sustaining design loads up to 500 lbs per clamp or linear foot minimum, adjusted to site-specific engineering design calculations). Fastening hardware must utilize round-point or non-cutting setscrew designs (e.g., 300-series stainless steel per ASTM F880) to prevent piercing, galling, or compromising protective coatings on metal roof seams.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Sources Sought | November 19, 2026 | November 27, 2026, 5:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.