Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Presolicitation

Airfield Civil Works IDIQ

Closed. Responses were due August 26, 2026, 10:00 AM ET.

Solicitation numberFA481926FM002
Notice typePresolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA4819 325 CONS PKP
Set-asideSmall Business Set Aside - Total (SBA)
NAICS237310 Highway, Street, and Bridge Construction
SBA size standard: $45M average annual receipts
Product or service codeZ2BD Repair or Alteration of Airport Runways and Taxiways
Place of performance32403
PostedAugust 10, 2026
Response dueAugust 26, 2026, 10:00 AM ET

Who holds the work now

Largest current award in NAICS 237310 at the Department of the Air Force, by dollars obligated: IAN CORPORATION, current end date September 23, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read FA481926FM002 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

This is the official pre-solicitation notice for the Tyndall Air Force Base Airfield Civil Works Indefinite Delivery, Indefinite Quantity (IDIQ) requirement. The points of contact (POCs) for this pre-solicitation are SrA Frances Montgomery at (850)283-8640 or frances.motngomery@us.af.mil, Mr. Joseph Petersen at (850)283-8618 or joseph.petersen.3@us.af.mil, and Mrs. Tanya Gutka at (850)283-8650 or tanya.gutka@us.af.mil.This will be a 100% Small Business Set-Aside under the North American Industry Classification System (NAICS) code 237310 Highway, Street, and Bridge Construction and the Product Service Code (PSC) Z2BD Repair or Alteration of Airport Runways and Taxiways Services. The small business size standard under NAICS 237310 is $45,000,000.00. The Department of the Air Force anticipates issuing a solicitation for a comprehensive Indefinite Delivery/Indefinite Quantity (IDIQ) contract to execute various civil works projects on the active airfield at Tyndall AFB where specific requirements and quantities will be established via individual Task Orders throughout the five-year ordering period (base year and four option years). The scope of work encompasses the demolition, repair, and new construction of heavy-load airfield pavements, including Portland Cement Concrete (PCC), Hot Mix Asphalt (HMA), and interlocking pavers. Associated civil infrastructure tasks include earthwork, subgrade preparation, and grading.Key Operational and Environmental Constraints:This requirement necessitates operating within a highly restricted, active military flightline environment. The successful contractor must possess the proven capability to:Execute complex construction phasing that minimizes operational downtime for active runways and taxiways.Maintain rigorous flightline safety protocols, including comprehensive Foreign Object Debris (FOD) prevention and dynamic coordination with Air Traffic Control (ATC) and Airfield Management.Achieve strict adherence to Unified Facilities Guide Specifications (UFGS) for heavy aircraft loading and DoD safety manual EM 385-1-1.Manage complex environmental compliance, including securing Environmental Resource Permits (ERP) and safely handling, containing, and disposing of contaminated soils and groundwater, specifically in areas impacted by Aqueous Film Forming Foam (AFFF).Upon release of the solicitation on the PIEE Solicitation module, all responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. At this time, the agency is not accepting proposals but all potential offerors are encouraged to indicate interest in this requirement through the PIEE Solicitation module.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationAugust 10, 2026August 26, 2026, 10:00 AM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.