Fire Alarm System Replacement, Mountain Home AFB

Closed. Responses were due January 28, 2026, 2:00 PM ET.

Solicitation numberFA489725R0008
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA4897 366 CONS PKP
Set-asideNone (full and open competition)
NAICS236220 Commercial and Institutional Building Construction
SBA size standard: $45M average annual receipts
Product or service codeZ2FZ Repair or Alteration of Other Residential Buildings
Place of performanceMountain Home AFB, ID 83648, USA
PostedJanuary 13, 2026
Response dueJanuary 28, 2026, 2:00 PM ET

Who holds the work now

Largest current award in NAICS 236220 at the Department of the Air Force, by dollars obligated: J.E. DUNN CONSTRUCTION COMPANY, current end date August 4, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read FA489725R0008 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

Amendment 0003 (04 in SAM) -Solicitation has been extended one final time to allow adequate time for responses to RFI Responses (03) -SOW has been updated to reflect responses to RFIs and site visit remarks. -PSC has been updated. -RFI Responses (03) has been uploaded. The United States Government (USG) has a requirement for design-build services set forth under this contract at Mountain Home Air Force Base (MHAFB) to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (without hazardous material survey for asbestos and lead-based paints, as per the MHAFB environmental office.), and proposed construction project schedule; followed by construction services to include demolition; new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. Site Visit: A site visit for any interested parties will be held on January 6th, 2026 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. All interested parties will need to meet at the visitor's center at 1:30 PM local (MST) to acquire day passes if you do not have base access already. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 2:00 PM local time (MST). Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Jan 12th, 2026 Proposals must be submitted no later than 12:00 PM local (Mountain), Jan 28th, 2026 Questions shall be directed to both POCs.

Attachments

SAM.gov lists 17 files with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationOctober 15, 2025December 1, 2025, 5:00 PM ET
SolicitationOctober 15, 2025December 1, 2025, 5:00 PM ET
SolicitationOctober 15, 2025November 28, 2025, 5:00 PM ET
SolicitationOctober 16, 2025December 1, 2025, 5:00 PM ET
SolicitationOctober 29, 2025December 1, 2025, 5:00 PM ET
SolicitationNovember 18, 2025January 5, 2026, 5:00 PM ET
SolicitationNovember 30, 2025January 20, 2026, 5:00 PM ET
SolicitationDecember 3, 2025January 20, 2026, 5:00 PM ET
SolicitationDecember 18, 2025January 20, 2026, 5:00 PM ET
SolicitationJanuary 13, 2026January 28, 2026, 2:00 PM ET