Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL

Open. Responses are due in 18 days, on December 15, 2026, 12:00 PM ET.

Solicitation numberFA813727R0001
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA8137 AFSC PZIOC
Set-asideSmall Business Set Aside - Total (SBA)
NAICS238190 Other Foundation, Structure, and Building Exterior Contractors
SBA size standard: $19M average annual receipts
Product or service codeZ2GD Repair or Alteration of Open Storage Facilities
Place of performanceTinker AFB, OK 73145, USA
PostedNovember 17, 2026
Response dueDecember 15, 2026, 12:00 PM ET

Who holds the work now

Largest current award in NAICS 238190 at the Department of the Air Force, by dollars obligated: GCI CONSTRUCTION & INSPECTIONS LLC, current end date June 30, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read FA813727R0001 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from 8 of 34 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationlowest price technically acceptable
Solicitation - FA813727R0001.pdf, page 26: "This acquisition will utilize Lowest Priced Technically Acceptable (LPTA) Source Selection procedures with technical proposals IAW the Multiple Award Contract (MAC)"
BondingBid guarantee (minimum of 20% of proposal)
Solicitation - FA813727R0001.pdf, page 29: "A bid guarantee (minimum of 20% of proposal) is required IAW FAR 28.101-1."
Past performanceManufacturer: minimum of five (5) years experience manufacturing metal wall systems and accessories
07 42 13.pdf, page 8: "Certify that metal wall panel system manufacturer has a minimum of five (5) years experience in manufacturing metal wall system and accessory products."
Past performanceManufacturer's engineer: minimum of four (4) years experience in wind load design analysis
07 42 13.pdf, page 8: "having a minimum of four (4) years experience as an engineer knowledgeable in wind load design analysis, protocols and procedures per MBMA MBSM"
Contract typefirm-fixed-price
Solicitation - FA813727R0001.pdf, page 4: "Pricing Arrangement: Firm Fixed Price"

The notice text

The text below is SAM.gov's own, unedited.

11/18/2026 UPDATE - Added missing specs mentioned in Appendix B. Please see Attachments. Due to the Added Specs, the RFI Due date has been extended to 11/30/2026 @ 12PM CST and the Proposal Due date has been extended to 12/15/2026 @ 12PM CST. ____________________________________________________________________________________________________ 11/16/2026 UPDATE - ADDED SPECS AND SITE VISIT SIGN IN SHEET TO SOLICITATION ATTACHMENTS & EXTENDED PROPOSAL DUE DATE TO 11/19/2026 @ 12PM CST _____________________________________________________________________________________________________ 11/09/2026 UPDATE - ADDING RFI RESPONSES. SEE ATTACHED DOCUMENT ______________________________________________________________________________________________________ This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by October 20, 2026 COB CST and EAL if required, an Initial Site Visit is set for October 22, 2026 @ 10am CST–– B1134. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationOctober 15, 2026November 16, 2026, 12:00 PM ET
SolicitationNovember 8, 2026November 16, 2026, 12:00 PM ET
SolicitationNovember 15, 2026November 19, 2026, 12:00 PM ET
SolicitationNovember 17, 2026November 23, 2026, 12:00 PM ET
SolicitationNovember 17, 2026November 19, 2026, 12:00 PM ET
SolicitationNovember 17, 2026December 15, 2026, 12:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.