Notices · Solicitation
SVBU Regression Testing Targets
Closed. Responses were due April 30, 2026, 6:00 PM ET.
| Solicitation number | FA821326RB004 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA8213 AFLCMC EBHK |
| Set-aside | Not listed |
| NAICS | 541690 Other Scientific and Technical Consulting Services SBA size standard: $19M average annual receipts |
| Product or service code | L023 Technical Representative- Ground Effect Vehicles, Motor Vehicles, Trailers, and Cycles |
| Place of performance | 85337 |
| Posted | March 30, 2026 |
| Response due | April 30, 2026, 6:00 PM ET |
Who holds the work now
Largest current award in NAICS 541690 at the Department of the Air Force, by dollars obligated: AMERESCO SELECT, INC., current end date May 31, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read FA821326RB004 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The requirement outlines contractor service support for one upcoming flight test. The test durationwill be three days, and a representative will be required to assist with test planning. The contractoris responsible for the refurbishment of three (3) existing UGVs and six (6) trailers, along with thetransport of UGVs, trailers, and support equipment to operate the vehicles/trailers. All vehicles andtrailers must be built laser safe and able to operate in remote/austere environments. At thecompletion of the test, contractor personnel will be responsible for the removal of all UGV, trailers,and debris from the test range. Additional requirements include the ability of the UGVs and trailersto operate on a dirt runway (smooth unimproved surface) and must be able to maneuver 90 degreeturns and rapidly accelerate and decelerate. Trailers and UGVs must have mounting positions forGo Pro Cameras (cameras are owned/operated by the test center) and easily replaceable materialon the top and sides of the trailers. UGV may be four-wheel drive (preferred) or front wheel drive.The contractor is responsible for providing all personnel (including a mechanic), services, facilities,and materials to accomplish the effort.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Presolicitation | February 16, 2026 | March 4, 2026, 7:00 PM ET |
| Presolicitation | February 16, 2026 | March 4, 2026, 7:00 PM ET |
| Solicitation | March 30, 2026 | April 30, 2026, 6:00 PM ET |
| Award Notice | May 27, 2026 | |
| Award Notice | May 27, 2026 |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.