Notices · Solicitation
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production
Open. Responses are due in 171 days, on May 17, 2027, 7:00 PM ET.
| Solicitation number | FA821426RB004 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA8214 C NIKM |
| Set-aside | None (full and open competition) |
| NAICS | 336419 Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing SBA size standard: 1,050 employees |
| Product or service code | 1427 Guided Missile Subsystems |
| Place of performance | UT 84041, USA |
| Posted | November 16, 2026 |
| Response due | May 17, 2027, 7:00 PM ET |
Who holds the work now
Largest current award in NAICS 336419 at the Department of the Air Force, by dollars obligated: LOCKHEED MARTIN CORPORATION, current end date December 18, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read FA821426RB004 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
From the attachments
Pulled by AI from 8 of 13 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.
| Clearance | T-1 eligibility, National Agency Check with Inquiries (NACI) 3. FT3 Production Follow-On CDRL Package 24 Apr 2026.docx: "For access to CDRLvue, the contractor must obtain and maintain T-1 eligibility, National Agency Check with Inquiries (NACI)." |
|---|---|
| Clearance | T-1 eligibility (NACI) 3. FT3 Production Follow-On CDRL Package 4 Nov 2026.docx: "For access to CDRLvue, the contractor must obtain and maintain T-1 eligibility, National Agency Check with Inquiries (NACI)." |
| Contract type | firm-fixed-price 4. FT3 Production Follow-On CLIN Structure_Draft May 26.xlsx: "1 | Materials, Build, Assemble and Test | FFP" |
| Contract type | cost-reimbursement 4. FT3 Production Follow-On CLIN Structure_Draft May 26.xlsx: "3 | Travel | CRNF" |
The notice text
The text below is SAM.gov's own, unedited.
Attachments
The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.
- 4. FT3 Production Follow-On CLIN Structure_Draft May 26.xlsx
- FT3 Production Follow-On Request for Proposal Memo_17 Nov 26.pdf
- 6. AFNWC-NIMS OPSEC Addendum.docx
- 2. FT3 Production Follow-On GRID.docx
- 3. FT3 Production Follow-On CDRL Package 24 Apr 2026.docx
- 3. FT3 Production Follow-On CDRL Package 4 Nov 2026.docx
- FT3 Production Follow-On Request for Proposal Memo_updated 7 July 26.docx
- 5. Solicitation - FA821426RB004 Rev 17 Nov 2026.pdf
- 5. Solicitation - FA821426RB004.pdf
- 1. FT3 PWS_Production Follow-On Final_17 Nov 26.pdf
- 1. FT3 PWS_Production Follow-On_1 Jun 26v1.docx
- 4. FT3 Production Follow-On CLIN Structure.xlsx
- 7. FT3_VSFB_locations for shipping Attachment.xlsx
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | July 6, 2026 | January 4, 2027, 7:00 PM ET |
| Solicitation | August 25, 2026 | February 18, 2027, 7:00 PM ET |
| Solicitation | November 16, 2026 | May 17, 2027, 7:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.