Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Sources Sought

Repair, Spares, & Engineering Services Enterprise Contract Embedded Global Positioning System (GPS)/Inertial Navigation System (EGI)

Closed. Responses were due November 23, 2026, 1:30 PM ET.

Solicitation numberFA8524-27-D-0602
Notice typeSources Sought
AgencyDEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA8524 AFSC PZAAA
Set-asideNot listed
NAICS334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
SBA size standard: 1,350 employees
Product or service code5826 Radio Navigation Equipment, Airborne
Place of performanceWarner Robins, GA 31098, USA
PostedNovember 8, 2026
Response dueNovember 23, 2026, 1:30 PM ET

Who holds the work now

Largest current award in NAICS 334511 at the Department of the Air Force, by dollars obligated: NORTHROP GRUMMAN SYSTEMS CORPORATION, current end date January 29, 2029. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read FA8524-27-D-0602 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

This follow-on effort is planned for a nine-year Period of Performance (PoP) spanning 10 September 2029 through 9 September 2038. The initial forecasted repair requirements are detailed in the attached RFI_Master List of NSNs, though the government reserves the right to modify specific NSN requirements in future correspondence. The government does not possess nor have rights to the technical data for these items. Furthermore, the government has designated these systems as commercial items. Prospective sources are advised that physical samples of these items are not available for evaluation. The contractor shall furnish all material, support equipment, tools, test equipment, and services. The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility. Contractor furnished material or parts used for replacement shall equal or exceed the quality of the original material or parts Contractors/Institutions responding to this RFI are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Sources SoughtOctober 14, 2026October 30, 2026, 1:30 PM ET
Sources SoughtOctober 18, 2026November 3, 2026, 1:30 PM ET
Sources SoughtNovember 8, 2026November 23, 2026, 1:30 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.