Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Combined Synopsis/Solicitation

Material Handling and Storage Aid Systems at JB Lindsey Graham, SC

Open. Responses are due in 41 days, on January 7, 2027, 3:00 PM ET.

Solicitation numberFA860427QB002
Notice typeCombined Synopsis/Solicitation
AgencyDEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA8604 AFLCMC PZI
Set-asideSmall Business Set Aside - Total (SBA)
NAICS333922 Conveyor and Conveying Equipment Manufacturing
SBA size standard: 500 employees
Product or service code3990 Miscellaneous Materials Handling Equipment.
Place of performance29404
PostedNovember 24, 2026
Response dueJanuary 7, 2027, 3:00 PM ET

Who holds the work now

Largest current award in NAICS 333922 at the Department of the Air Force, by dollars obligated: U.S. MATERIALS HANDLING CORPORATION, current end date March 8, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read FA860427QB002 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

This requirement is for a mechanized materials handling system (MMHS)/storage aid system for Buildings 506 and 543, at Joint Base Lindsey Graham, South Carolina. The project encompasses the design, fabrication, installation, orientation, and testing of a storage aid system within the buildings. All work shall be performed in accordance the Cover Purchase Description (PD) document, including Appendices A-H, and Air Force (AF) Drawings BCH602-01, BCH602-02, BCH602-03 and BCH602-04. The contractor shall provide all equipment, materials, and labor necessary for the complete installation and testing of the MMHS. This includes making any required system adjustments and providing orientation to Government personnel. The contractor shall comply with all applicable laws, regulations, local zoning and permitting requirements, and referenced governmental guidance documents as specified in the PD document and appendices. The Mechanized Materials Handling System will consist of the following major components: Gantry Crane System, Manual Gravity Roller Conveyor, Expandable Roller Conveyor, Mobile Aisle - 1, Mobile Aisle - 2, Mobile Aisle - 3, Bin Shelving, Pallet Racks Type P1 through P7, Steel Decking, all types and Rolling Safety Ladders.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationNovember 24, 2026January 7, 2027, 3:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.