Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Presolicitation

Repair Nose Dock 7 B1232

Open. Responses are due in 13 days, on December 10, 2026, 11:59 PM ET.

Solicitation numberFTQW062467
Notice typePresolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA5004 354 CONS PK
Set-asideSmall Business Set Aside - Total (SBA)
NAICS541330 Engineering Services
SBA size standard: $25.5M average annual receipts; exception for Military and Aerospace Equipment and Military Weapons: $47M average annual receipts; exception for Contracts and Subcontracts for Engineering Services Awarded Under the National Energy Policy Act of 1992: $47M average annual receipts; exception for Marine Engineering and Naval Architecture: $47M average annual receipts
Product or service codeC219 Other Architect and Engineering Services
Place of performanceEielson AFB, AK 99702, USA
PostedNovember 9, 2026
Response dueDecember 10, 2026, 11:59 PM ET

Who holds the work now

Largest current award in NAICS 541330 at the Department of the Air Force, by dollars obligated: L3HARRIS TECHNOLOGIES, INC., current end date January 31, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read FTQW062467 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The 354th Eielson Contracting Squadron is seeking qualification packages for A&E service for the project below: The Government requires A-E Title I investigation and design services for the repair and renovation of Nose Dock 7, Building 1232, at Eielson AFB, Alaska. The objective is to develop a complete and coordinated design that addresses the facility deficiencies and operational requirements identified in this SOW and provides the basis for a future construction acquisition. The scope also includes Title II construction-phase design support as identified in this SOW. Construction execution is not included in this effort. This information will be utilized to prepare comprehensive drawings, schedules, specifications, and cost estimates for all facets of work and disciplines/trades involved in the construction project. The primary objective is to develop a biddable set of construction documents tailored to address the unique challenges presented by the extreme Arctic conditions at Eielson AFB, AK. Notices to Offerors: This RFQ is a request for information and not to be confused with a request for proposal (RFP). This RFQ is strictly used by the Government to conduct market research for determining the three (3) most highly qualified offerors. The contract schedule set fourth in the statement of work requires a delivery of 100% in 282 calendar days. If this is something your firm is interested in and accomplish, please submit a combined Instructions to Offers (Evaluation Factors Document), SF-330 (Architect-Engineer Qualification-Standard Form 330), and PPQ (Past Performance Questionnaire) to 354CONS.PKA.Designs@us.af.mil. All questions regarding this RFQ must be emailed to the e-mail addresses above by 3:00 P.M. AKT on 27 November 2026. Responses will be provided by COB 2 Dec 2026.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationNovember 9, 2026December 10, 2026, 11:59 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.