Notices · Solicitation
Request for Whitepapers: AEDC Velocity Alliance - A Multi-Billion Dollar OTA Consortium Opportunity
Open. Responses are due in 1403 days, on September 30, 2030, 6:00 PM ET.
| Solicitation number | FA9101-26-9-Velocity_Alliance |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE AIR FORCE, FA9101 AEDC PKP PROCRMNT BR |
| Set-aside | Not listed |
| NAICS | 541330 Engineering Services SBA size standard: $25.5M average annual receipts; exception for Military and Aerospace Equipment and Military Weapons: $47M average annual receipts; exception for Contracts and Subcontracts for Engineering Services Awarded Under the National Energy Policy Act of 1992: $47M average annual receipts; exception for Marine Engineering and Naval Architecture: $47M average annual receipts |
| Product or service code | AC13 National Defense R&D Services; Department of Defense - Military; Experimental Development |
| Place of performance | Not listed |
| Posted | November 14, 2026 |
| Response due | September 30, 2030, 6:00 PM ET |
Who holds the work now
Largest current award in NAICS 541330 at the Department of the Air Force, by dollars obligated: L3HARRIS TECHNOLOGIES, INC., current end date January 31, 2028. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read FA9101-26-9-Velocity_Alliance in full and tell me what stage it's at.
Your first 10 searches are free. No card.
From the attachments
Pulled by AI from 8 of 46 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.
| Evaluation | stated in the file AEDC Velocity Alliance - Request for Whitepaper-Amend 2 - 1…, page 7: "A submission must receive a "Pass" on all four parts to be considered for membership in the Alliance." |
|---|---|
| Evaluation factors | Part 1 Mandatory Certification Requirements; Part 2 Technical Competency; Part 3 Intellectual Prope… AEDC Velocity Alliance - Request for Whitepaper-Amend 2 - 1…, page 9: "Part 4: Innovation and Partnership Capability Evaluation (Pass/Fail)" |
| Questions due | May 1, 2026, COB AEDC Velocity Alliance - Request for Whitepaper-Amend 2 - 1…, page 12: "Questions Due Date: 1 May 2026, COB" |
| Site visit | June 17, 2026, mandatory AEDC Velocity Alliance - Request for Whitepaper-Amend 2 - 1…, page 2: "The selected vendor must attend the mandatory Industry Day to complete the onboarding evaluation." |
| Site visit | mandatory AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf, page 19: "Attendance at the Industry Day (for Opportunity 1) or the Site Visit (for Opportunity 2) is a mandatory, non-negotiable requirement for onboarding." |
| Past performance | representative project completed within the last five (5) years AEDC Velocity Alliance - Request for Whitepaper-Amend 2 - 1…, page 4: "please provide a detailed response based on a representative project your company has completed within the last five (5) years" |
| Past performance | one representative project completed within the last five (5) years AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf, page 12: "Project Timeliness: The project described was completed within the last five (5) years." |
| Past performance | representative completed project within the last five years AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf, page 12: "Non-compliant Project: The project example is older than five years or is not a completed project." |
| Past performance | 1 more in the files, not shown here. |
| Contract type | stated in the file AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf, page 1: "satisfy the legal conditions for using this type of Other Transaction authority (specifically 10 U.S.C. § 4022(d)(1)(A) or (B))" |
The notice text
The text below is SAM.gov's own, unedited.
Attachments
The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.
- AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
- AEDC Velocity Alliance - Request for Whitepaper-Amend 2 - 15 May 26.pdf
- AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
- Atch 3 - CMMC-Information..pdf
- AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf
- AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
- Atch 4 - CMMC-FAQsv4.pdf
- AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf
- AEDC Velocity Alliance - Request for Whitepaper-Amend 5- 26 Aug 26.pdf
- AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
- Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf
- AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
- AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
- AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26..pdf
- Atch 5 - UTSI Map.pdf
- AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
- AEDC Velocity Alliance Consortium_Q_A-11.15.26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 5 Mar 26.pdf
- AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
- AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
- AEDC Velocity Alliance Consortium_Q_A-8.31.26.pdf
- Atch 4 - CMMC-FAQsv6.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 15 Nov 26.pdf
- AEDC Velocity Alliance - Request for Whitepaper.pdf
- AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 15 Oct 26.pdf
- AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
- AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives-5 Mar 26.pdf
- AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf
- AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
- Atch 3 - CMMC-Information.pdf
- AEDC Velocity Alliance Consortium_Q_A-7.17.26.pdf
- AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
- AEDC Velocity Alliance - Request for Whitepaper-Amend 7- 15 Nov 26.pdf
- Atch 6 - VAC_RWP_Part_4_Identified_Partner_Self_Certification.pdf
- Summary of Changes-AEDC Velocity Alliance-RWP-Amend 2.pdf
- AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives - 26 Aug 26.pdf
- AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
- AEDC Velocity Alliance - Request for Whitepaper-Amend 6- 15 Oct 26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
- AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
- AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
What SAM.gov has posted, oldest first
30 notices, the first posted March 16, 2026 and the newest November 14, 2026.
Show all 30
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | March 16, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | March 17, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | March 29, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | March 30, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | March 30, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | April 14, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | April 16, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | April 20, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | April 22, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | April 23, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | April 26, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | April 27, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | April 29, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | April 30, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | April 30, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | May 11, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | May 14, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | May 21, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | May 25, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | June 13, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | June 22, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | June 23, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | July 14, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | July 16, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | July 16, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | August 25, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | August 30, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | October 14, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | November 14, 2026 | September 30, 2030, 6:00 PM ET |
| Solicitation | November 14, 2026 | September 30, 2030, 6:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.