Notices · Special Notice
NSWC-PHD MATAC OTA Special Notice: MK41 Vertical Launching System - Super ATE
Open. Responses are due in 12 days, on December 9, 2026, 12:00 PM ET.
| Solicitation number | LMR-27-05-001 |
|---|---|
| Notice type | Special Notice |
| Agency | DEPT OF DEFENSE, DEPT OF THE NAVY, COMMANDING OFFICER |
| Set-aside | Not listed |
| NAICS | 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) SBA size standard: 1,000 employees (SBA footnote 11); exception for Aircraft, Aircraft Engine and Engine Parts: 1,500 employees (SBA footnote 11); exception for Other Aircraft Parts and Auxiliary Equipment: 1,250 employees (SBA footnote 11); exception for Guided Missiles and Space Vehicles, Their Propulsion Units and Propulsion Parts: 1,300 employees (SBA footnote 11) |
| Product or service code | Not listed |
| Place of performance | Not listed |
| Posted | November 11, 2026 |
| Response due | December 9, 2026, 12:00 PM ET |
Who holds the work now
Largest current award in NAICS 541715 at the Department of the Navy, by dollars obligated: FLUOR MARINE PROPULSION, LLC, current end date September 30, 2028. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read LMR-27-05-001 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
NSWC PHD requires a Super ATE solution that consolidates, to the maximum extent practicable, the functions of multiple existing or planned ATE systems into a common, modular, and scalable platform. The objective is to reduce the number of ATE assets required for LSEQ and MCP production; decrease laboratory and production-test footprint; improve test repeatability; reduce setup time; and simplify calibration, maintenance, configuration management, and lifecycle support. NSWC PHD requires Automated Test Equipment (ATE) to support production acceptance testing of MK 41 Vertical Launch System (VLS) Launch Sequencer (LSEQ) and Motor Control Panel (MCP) assemblies, including line-replaceable units (LRUs) within those assemblies. Currently, conducting lifecycle maintenance and testing requires utilizing multiple disparate pieces of test equipment, which creates a large footprint and increases operational complexity. The Government requires an innovative, integrated production-test capability that can consolidate multiple ATE functions into a common Super ATE architecture. The required capability must support complete-box testing, LRU-level testing, acceptance testing, and support for shock and vibration test requirements. Organizations interested in responding to this RFS must be members of MATAC. Visit MATAC.org for more information.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Special Notice | November 11, 2026 | December 9, 2026, 12:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.