Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

93--HEAD WINDOW ASSY

Closed. Responses were due November 25, 2026, 1:00 PM ET.

Solicitation numberN0010425RFD14
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE NAVY, NAVSUP WEAPON SYSTEMS SUPPORT MECH
Set-asideNot listed
NAICS327212 Other Pressed and Blown Glass and Glassware Manufacturing
SBA size standard: 1,250 employees
Product or service code9340 Glass Fabricated Materials
Place of performanceNot listed
PostedNovember 5, 2026
Response dueNovember 25, 2026, 1:00 PM ET

Who holds the work now

Largest current award in NAICS 327212 at the Department of the Navy, by dollars obligated: L3 TECHNOLOGIES, INC., current end date December 29, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read N0010425RFD14 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A|N/A |SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2025)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7|||||||| LIST OF AWARD ATTACHMENTS|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|327212|1250|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|email| TYPE OF CONTRACT (APR 1984)|1|firm fixed price| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA (MAY 2024))|1|| DD1423 Data Item A001 may be waived if already on file atNAVSUP WSS Mechanicsburg. Any contract awarded as a result of this solicitation will beDO rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.2 ;The T-33 tool which will be needed for the manufacture of Head Window Frame Cover, P/N 055304-22 must be supplied to the successful bidder by NUWCDIVNPT upon award. The successful bidder must be responsible for contacting the Naval Undersea Warfare Center Division Newport, RI, POC (Randy Eldred 401-832-7409) to obtain the required tool. The T-33 tool must be returned to NUWCDIVNPT POC within 30 day of completion of the tasking.; 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;933F056007 34228 K D PL933F056007 34228 K D 933F055304 34228 H D 933F055306 34228 H D 933F055307 34228 L D 933F055022 34228 D D PL933F055022 34228 D D ER887.91 34228 B D ER450.199 34228 D D ER933.135 34228 C D ER933.35 34228 G D; DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-A240 | | | |240501|A| | | DOCUMENT REF DATA=ASTM-A262 | | | |150901|A| | | DOCUMENT REF DATA=ASTM-A582 | | | |211101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810727|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;The Head Window Assembly must be in accordance with Kollmorgen Drawing 933F056007 and Parts List PL933F056007, except as amplified or modified herein.; 3.2 ;The alignment callout in Zone F1 of drawing 933F055307 must be flush within 0.001 inches.; 3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Frame, Head Window Cover, Drawing 933F055304, and Frame, Head Window, Drawing 933F055306; Material - ;ASTM-A582, UNS Alloy S30300, Condition A, or SAE-AMS-QQ-S-763, Class 304, Condition A, or ASTM-A240, UNS Alloy S30400, Annealed and must meet the mechanical properties cited in note 9.2 on Drawings 933F055304 and 933F055306; Part - ;Window, Heated Head, Drawing 933F055307; Material - ;Fused Silica, Corning #7980 or equivalent; 3.4 Certifications - Certifications for the window must show identification of material and the manufacturer of material from which the window was made. 3.5 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - ;Hydrostatic Pressure Test; Item - ;Window Assembly, Head, Drawing 933F056007; Performance - ;Note 13 on Drawing 933F056007 at 1000 +50/-0 psi for 30 +5/-0 minutes; Acceptance - ;Without failure or harmful deformation of any part or seal; Test - ;Acceptance Test; Item - ;Window Assembly, Head, Drawing 933F056007; Performance - ;Note 18 on Drawing 933F056007; Acceptance - ;Note 18 on Drawing 933F056007; Test - ;Thermal Shock Test; Item - ;Window Assembly, Head, Drawing 933F056007; Performance - ;Note 8 on Drawing 933F056007 for 30 minutes +5/-0 minutes for both high and low temperature thermal shock tests; Acceptance - ;Note 8 on Drawing 933F056007; Attribute - ;Certification of Compliance; Item - ;Window, Heated Head, Drawing 933F055307; Performance - ;Note 12 on Drawing 933F055307; Test - ;Resistivity Test; Item - ;Window, Heated Head, Drawing 933F055307; Performance - ;Note 9 on Drawing 933F055307; Acceptance - ;Note 9 on Drawing 933F055307; Test - ;Light Transmission Test; Item - ;Window, Heated Head, Drawing 933F055307; Performance - ;Note 5A on Drawing 933F055307; Acceptance - ;Note 5 on Drawing 933F055307; Test - Intergranular Corrosion Test (Only for SAE-AMS-QQ-S-763, Classes 304-condition A, 304L, 316-condition A, 316L, 317-condition A, 321 and 347 material. Test must be performed prior to fabrication/machining) Item - ;Frame, Head Window Cover, Drawing 933F055304 and Frame, Head Window, Drawing 933F055306; Performance - SAE-AMS-QQ-S-763 Acceptance - SAE-AMS-QQ-S-763 Test - Intergranular Corrosion Testing Item - ;(When manufactured from ASTM-A240 material) Frame, Head Window Cover, drawing 933F055304 and Frame, Head Window, drawing 933F055306; Performance - ASTM-A262, Practice E Acceptance - ASTM-A262 3.6 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.7 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.8 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.9 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific

The rest of the text is on SAM.gov.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationApril 11, 2025May 27, 2025, 12:00 AM ET
SolicitationMay 14, 2025June 16, 2025, 2:00 PM ET
PresolicitationNovember 5, 2026November 25, 2026, 1:00 PM ET
SolicitationNovember 5, 2026November 25, 2026, 1:00 PM ET
SolicitationNovember 5, 2026November 25, 2026, 1:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.