Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

BAR,METAL

Open. Responses are due in 7 days, on December 4, 2026, 3:30 PM ET.

Solicitation numberN0010426QFE84
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE NAVY, NAVSUP WEAPON SYSTEMS SUPPORT MECH
Set-asideNot listed
NAICS331491 Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing and Extruding
SBA size standard: 900 employees
Product or service code9530 Bars and Rods, Nonferrous Base Metal
Place of performanceNot listed
PostedNovember 19, 2026
Response dueDecember 4, 2026, 3:30 PM ET

Who holds the work now

Largest current award in NAICS 331491 at the Department of the Navy, by dollars obligated: METALLOY INDUSTRIES, INC., current end date April 15, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read N0010426QFE84 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

CONTACT INFORMATION|4|N743.4|WVB|1 771-229-0743|amanda.l.bailey50.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||X||X||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo-Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|N39040|N50286|TBD|133.2|N/A|N/A|S4306A - Material|N/A|N/A|See DD1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY .MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|365 days after acceptance of material|365 days after acceptance of material||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. The offer due date is updated to 25 September 2026. 2. CLIN 0002AA has been removed from this solicitation. \ 1. Data Item A001 (inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mech. 2. NAVSUP WSS Mech will be considering past performance in the evaluation of offers in accordance with DFARS 252.204-7024. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 45 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material (365 days) Please quote actual delivery days Early and incremental delivery is acceptable at no additional cost to the Government. 4. This procurement is issued pursuant to Emergency Acquisition Flexibilities. 5. A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, the permissible variation shall be limited to +0% / -5% and applies to the total contract quantity. 6. FAR 52.232-25(a)(5), entitled Prompt Payment, Constructive Acceptance is changed from 7 days to 45 days after delivery of the supplies in accordance with the terms and conditions of the contract. 7. This requirement has no Government source inspection. Inspection and Acceptance will occur at destination/destination. 8. This is a combined solicitation for multiple related items. The CLINS within this solicitation will be reviewed at CLIN level for determination of award, with award decision being made at CLIN level this may result in multiple awards to multiple vendors. Offerors are advised that quotes should not contain quantity discounts for multiple combined CLINS as this may result in award at an unreasonably low value, in the event all CLINS are not awarded (won). Vendors are invited to offer on any or all CLINS. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=ANSI/ASQ-Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| | DOCUMENT REF DATA=ASTM-B666 | | | |201101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=SAE AMS 2806 | | |C |080301|A| | | DOCUMENT REF DATA=SAE AMS 2807 | | |A |000901|A| | | DOCUMENT REF DATA=SAE AMS 2809 | | |A |070801|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=SAE AMS-STD-185 | | | |000901|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | 3. REQUIREMENTS 3.1 Manufacture and Design - The item furnished under this contract/purchase order must meet the requirements as specified in QQ-N-281, except as amplified or modified herein. QQ-N-281 ordering data information is provided below: A. Nickel-copper alloy bar, rod, plate, sheet, strip, wire, forgings, and structural and special shaped sections; QQ-N-281 B. Class - ;A; Form - 1 Size - ;3 inches (round); Condition - ;Hot Finished, Annealed; Surface Finish - ;as rolled; C. Determination of yeild strength using the 0.01 percent offset method is not required. D. Ultrasonic testing ;is required; E. Liquid penetrant inspection is not required. F. Forgings are not applicable to this contract/purchase order. G. Commercially sharp conrners are acceptable. H. Length - Under 5" dia. = 8 feet min / 12 feet max (plus or minus 10%) 5" dia & over = 5 feet min / 12 feet max (plus or minus 10%) OR as specified elsewhere in the contract/purchase order. I. Shapes are not applicable to this contract/purchase order. J. Edges other than standard are not applicable to this contract purchase order. K. Tolerances other than those specified are not required. L. Wire is not applicable to this contract/purchase order. M. Marking must be as specified elsewhere in the contract/purchase order. N. Ultrasonic testing must be as specified elsewhere in the contract/purchase order. O. Level of shipment, preservation, packaging, and packing must be as specified elsewhere in the contract/purchase order. P. Precision straightened, cold drawn shafting is not applicable to this contract/purchase order. Q. A descaled surface is not applicable to this contract/purchase order. Note: When QQ-N-281 Class A or B material is required and the required materialsize is not listed in QQ-N-281, refer to ASTM B164 for mechanical property requirements. 3.2 Bar, Pipe, and Tube Quantities - When this order results in supplying fewer than 5 pieces as defined in the "Length" paragraph above, all material must be from a single heat of material. 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing (if any) per applicable specifications is still required, but certifications are only required as listed below. Test - Ultrasonic Inspection Item - ;Each Metal Bar; Performance - T9074-AS-GIB-010/271 Acceptance - QQ-N-281 3.4 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government inelectronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.4.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to theoperational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.4.2 Requests for Waivers/Deviations for NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.4.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of theproduct. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineeringchange. 3.5 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for

The rest of the text is on SAM.gov.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationJuly 8, 2026August 10, 2026, 4:30 PM ET
SolicitationSeptember 10, 2026September 25, 2026, 4:30 PM ET
SolicitationSeptember 10, 2026September 25, 2026, 4:30 PM ET
SolicitationNovember 19, 2026December 4, 2026, 3:30 PM ET
SolicitationNovember 19, 2026December 4, 2026, 3:30 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.