Notices · Solicitation
DISPLAY UNIT
Open. Responses are due in 4 hours, on November 27, 2026, 3:30 PM ET.
| Solicitation number | N0010426QNE61 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE NAVY, NAVSUP WEAPON SYSTEMS SUPPORT MECH |
| Set-aside | Not listed |
| NAICS | 335931 Current‑Carrying Wiring Device Manufacturing SBA size standard: 600 employees |
| Product or service code | 6130 Converters, Electrical, Nonrotating |
| Place of performance | Not listed |
| Posted | October 20, 2026 |
| Response due | November 27, 2026, 3:30 PM ET |
Who holds the work now
Largest current award in NAICS 335931 at the Department of the Navy, by dollars obligated: NEWVAC LLC, current end date August 30, 2028. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read N0010426QNE61 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
CONTACT INFORMATION|4|N744.11|BL5/BL6|771-229-0480|rachel.e.kern4.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|NA|TBD|N00104|TBD|TBD|See Schedule|TBD|NA|NA|TBD|||||| MONETARY LIMITATION REPAIR PURCHASE ORDERS|1|Varies per NIIN| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|POC on Page 1| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|600 Days ARO| OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)|1|600 Days ARO| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. Amend 0002 hereby increased the quantity for NIIN 016750032 from qty 1 to qty 2. 2. All other terms and conditions remain unchanged. \ 1. This solicitation is for the repair of 6 each of NSN 5998 015426982 IAW Reference number N112148. 10 each of NSN 6130 016556512 IAW Reference number N166274. 1 each of NSN 6120 016717017 IAW Reference number N165823. 1 each of NSN 7025 016750032 IAW Reference number N126782-4. Replacement or new procurementwill not be considered. The Government does not own the drawings or data rightsto this NSN. 2. Government-Source Inspection and Acceptance (G-S I&A) is required. If the G-S I&A will occur at a different CAGE from the Admin Award CAGE, please provide the repair facility CAGE and/or packaging CAGE with the quote. 3. Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual dateof physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. a. Requested RTAT: 140 Days b. Proposals shall reference the proposed RTAT and any capacity constraints. 4. Please provide the following information in the repair quote: a. Your CAGE (used as the awardee CAGE):___________________ b. the unit repair price: $____________________________________ and whether this price is firm-fixed price (FFP)_____; or estimated______ c. Beyond Repair (BR) Price $____________. d. Repair turn-around (number of days from receipt of asset(s) to shipment of repaired asset(s):_______days e. Throughput Constraint: _____/month. Refers to the total assets to be repaired monthly after initial delivery commences. A throughput of 0000/month reflects no throughput constraint. f. The new procurement cost of this NSN (if known): $________________________ g. Is this item (NSN) OBSOLETE: YES____ or NO _____ h. The repair CAGE _____________ and packaging CAGE___________. 5. Teardown and evaluation only quotes will NOT be accepted. 6. If this order is issued under and pursuant to the provision of the Basic Ordering Agreement (BOA), the terms and conditions of the Agreement are hereby incorporated by reference and, except as provided herein by this order, remain in full force and effect. If any conflict arises in the terms of this order versusthe terms in the BOA, the terms of the BOA shall apply. 7. Induction Expiration Date: 120 days after the date of subsequent award. Any asset received after this date in days is not authorized to be repaired without bi-lateral agreement between the vendor and Contracting Officer. 8. If Firm-Fixed Repair Pricing is provided, Beyond Economical Repair (BER) does not exist. With DCMA concurrence, Beyond Repair (BR) is possible. If the unit is determined BR, the contract will be definitized at the agreed upon BR unit price. 9. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications)related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, suchas email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 10. The Government retains the option to order an additional quantity up to 100% of this order for 600 days ARO at the same price. The Government may choose to exercise this option or not. 11. Please submit a repair quote to Rachel Kern via email: RACHEL.E.KERN4.CIV@US.NAVY.MIL This is the only submission method authorized. 12. This requirement is solicited pursuant to Emergency Acquisition Flexibilities. 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the POWER SUPPLY . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DOCUMENT REF DATA=MIL-STD-129 | | |R |180524|A| |03| DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | DOCUMENT REF DATA=MIL-STD-1686 | | |C |951025|A| | | DOCUMENT REF DATA=ISO9001 | | | |150901|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The POWER SUPPLY furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;52088 N166274; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Electrostatic Discharge Control - The Contractor shall comply with the electrostatic discharge control requirements established in ANSI/ESD S20.20, "ESD Association Standard for the Development of an Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)", which superseded MIL-STD-1686C. 3.5 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper
The rest of the text is on SAM.gov.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | August 17, 2026 | September 17, 2026, 4:30 PM ET |
| Solicitation | September 21, 2026 | October 9, 2026, 4:30 PM ET |
| Solicitation | September 22, 2026 | October 9, 2026, 4:30 PM ET |
| Solicitation | October 20, 2026 | November 27, 2026, 3:30 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.