Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

59--IEM/MMM TACTICL EHF

Closed. Responses were due November 13, 2026, 1:00 PM ET.

Solicitation numberN0010426RFD04
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE NAVY, NAVSUP WEAPON SYSTEMS SUPPORT MECH
Set-asideNot listed
NAICS335931 Current‑Carrying Wiring Device Manufacturing
SBA size standard: 600 employees
Product or service code5935 Connectors, Electrical
Place of performanceNot listed
PostedNovember 5, 2026
Response dueNovember 13, 2026, 1:00 PM ET

Who holds the work now

Largest current award in NAICS 335931 at the Department of the Navy, by dollars obligated: NEWVAC LLC, current end date August 30, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read N0010426RFD04 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

CONTACT INFORMATION|4|N743.49|WVE|771-229-0573|benjamin.t.spangler.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL BENJAMIN.T.SPANGLER.CIV@US.NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7|||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| PERFORMANCE-BASED PAYMENTS (APR 2012)|1|| LIST OF AWARD ATTACHMENTS|5|||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1|| REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|Electronic mail| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|| ALTERATIONS IN SOLICITATION (APR 1984)|3|||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| This amendment is issued to update the quantity. \ This amendment is issued to extend the closing date. \ 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 5. The complete RFP package must be signed and returned prior to the closing date. Emailed or faxed proposals are acceptable. NECO quotes will NOT be accepted and will be determined non-responsive. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;LB01504 16275 K B LB01517 16275 J B LB01527 16275 C B LB01545 16275 E B LB01883 16275 B B LB01882 16275 - B LB01884 16275 A B LB01544 16275 P B LB01600 16275 K B ITI-500 16275 V B QA-1129 16275 E B; DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|A| |01| DOCUMENT REF DATA=SAE AMS 5666 | | |J |161101|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;Hull Penetrating Assembly must be in accordance with LaBarge INC. Drawing LB01504, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, Item 2 on Drawing LB01527; Material - ;QQ-N-286, Form 2, Annealed and Age Hardened and Meeting the Mechanical Properties of Drawing LB01527, Note 9; Part - ;Header, Find 1 on Drawing LB01600; Material - ;QQ-N-286, Form 2, Annealed and Age Hardened and Meeting the Mechanical Properties of drawing LB01600, Note 8 or SAE AMS 5666, Round Bar, Hot Finished and Annealed and Meeting the Mechanical Properties of drawing LB01600, Note 9; Part - ;Washer, Drawing LB01883; Material - ;QQ-N-286, Form 2, Annealed and Age Hardened and Meeting the Mechanical Properties of drawing LB01883, Note 6; Part - ;Hex Nut, Drawing LB01882; Material - ;QQ-N-286, Form 2, Annealed and Age Hardened and Meeting the Mechanical Properties of drawing LB01882, Note 6; Part - ;Spacer, Drawing LB01884; Material - ;QQ-N-286, Form 2, Annealed and Age Hardened and Meeting the Mechanical Properties of drawing LB01884, Note 6; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Electrical Testing; Item - ;Each Hull Penetrating Assembly; Performance - ;INSPECTION / TEST INSTRUCTIONS ITI-500; Acceptance - ;INSPECTION / TEST INSTRUCTIONS ITI-500; Test - ;Hydrostatic Pressure Test; Item - ;Each Hull Penetrating Assembly; Performance - ;INSPECTION / TEST INSTRUCTIONS ITI-500 and QA-1129; Acceptance - ;INSPECTION / TEST INSTRUCTIONS ITI-500; Test - ;Tensile Test (after glass sealing and age hardening processes); Item - ;One test specimen for each combination of starting material heat lot and age hardening batch when headers are made from QQ-N-286; Performance - ;Drawing LB01544, Note 13; Acceptance - ;Drawing LB01544, Note 13; Test - ;Tensile Test (after glass sealing); Item - ;One test specimen for each heat lot when headers are made from SAE AMS 5666; Performance - ;Drawing LB01544, Note 14; Acceptance - ;Drawing LB01544, Note 14; Test - ;Hardness test (after glass sealing and age hardening processes); Item - ;Each header when made from QQ-N-286; Performance - ;Drawing LB01544, Note 13; Acceptance - ;Drawing LB01544, Note 13; Test - ;Hardness test (after glass sealing); Item - ;Each header when made from SAE AMS 5666; Performance - ;Drawing LB01544, Note 14; Acceptance - ;Drawing LB01544, Note 14; Attribute - ;Time/Temperature Heat Treatment Record; Item - ;Each header when made from QQ-N-286; Performance - ;Drawing LB01544, Note 13; Attribute - Annealing and Age Hardening Item - ;Body, Item 2 on Drawing LB01527; Header Find 1 on Drawing LB01600 (when made from QQ-N-286); Washer, Drawing LB01883; Hex Nut, Drawing LB01882; and Spacer, Drawing LB01884; Performance - QQ-N-286 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification 3.4 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by

The rest of the text is on SAM.gov.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationMay 26, 2026July 13, 2026, 12:00 AM ET
SolicitationJuly 15, 2026August 5, 2026, 2:00 PM ET
SolicitationNovember 5, 2026November 13, 2026, 1:00 PM ET
PresolicitationNovember 5, 2026November 13, 2026, 1:00 PM ET
SolicitationNovember 5, 2026November 13, 2026, 1:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.