Notices · Solicitation
59--CABLE ASSEMBLY SET
Open. Responses are due in 3 days, on November 30, 2026, 2:00 PM ET.
| Solicitation number | N0010427RNA21 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE NAVY, NAVSUP WEAPON SYSTEMS SUPPORT MECH |
| Set-aside | Not listed |
| NAICS | 335931 Current‑Carrying Wiring Device Manufacturing SBA size standard: 600 employees |
| Product or service code | 5995 Cable, Cord, and Wire Assemblies: Communication Equipment |
| Place of performance | Not listed |
| Posted | November 1, 2026 |
| Response due | November 30, 2026, 2:00 PM ET |
Who holds the work now
Largest current award in NAICS 335931 at the Department of the Navy, by dollars obligated: NEWVAC LLC, current end date August 30, 2028. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read N0010427RNA21 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
CONTACT INFORMATION|4|N744.1|AW4|771-229-3917|brittany.a.langletz.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specifications C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION/ACCEPTANCE POINT|6|TBD|TBD|TBD|TBD|TBD|TBD| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|TBD|10 - W25G1U/11 - W62G2T|TBD|N/A|N/A|N/ A|N/A|N/A|N/A|See form DD1423|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery|One year from date of delivery||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|One (1)|015865772|30|||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| LIST OF AWARD ATTACHMENTS|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (DEV 2026-O0048)(MAR 2026)|2||| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|Firm Fixed Price| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||X| 1. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 2. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 3. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers IAW FAR 13.106(a)(2). 4. Any contract awarded as a result of this solicitation will be ;DO; certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 5. This solicitation requires First Article Testing (FAT). See FAR 52.209-3 First Article Approval - Contractor Testing for more details. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CABLE ASSEMBLY SET . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=2865896 |10001| H| |D| | | | DRAWING DATA=2865896 |10001| D|FN |D| | | | DRAWING DATA=2865896 |10001| G|1N |D| | | | DRAWING DATA=6557889 |53711| C| |D| | | | DRAWING DATA=6557908 |53711| C| |D| | | | DRAWING DATA=6557908 |53711| B|1N |D| | | | DRAWING DATA=6557909 |53711| B| |D| | | | DRAWING DATA=6557910 |53711| B| |D| | | | DRAWING DATA=6557911 |53711| B| |D| | | | DRAWING DATA=6557912 |53711| B| |D| | | | DRAWING DATA=6557913 |53711| D| |D| | | | DRAWING DATA=6557913 |53711| C|1N |D| | | | DRAWING DATA=6557914 |53711| C| |D| | | | DRAWING DATA=6557915 |53711| A| |D| | | | DRAWING DATA=6557916 |53711| A| |D| | | | DRAWING DATA=6557917 |53711| A| |D| | | | DRAWING DATA=6557918 |53711| A| |D| | | | DRAWING DATA=6557919 |53711| A| |D| | | | DRAWING DATA=6557920 |53711| D| |D| | | | DRAWING DATA=6557921 |53711| A| |D| | | | DRAWING DATA=6557942 |53711| C| |D| | | | DRAWING DATA=6557944 |53711| F| |A| | | | DRAWING DATA=6557944 |53711| D|1N |D| | | | DRAWING DATA=6894541 |53711| B|FN |D| | | | DRAWING DATA=7339969 |53711| C| |D| | | | DRAWING DATA=8350559 |53711| B| |D| | | | DRAWING DATA=8350592 |53711| B| |D| | | | DRAWING DATA=8485767 |53711| A| |D| | | | DOCUMENT REF DATA=MIL-STD-12 | | |D |980925|A| | | DOCUMENT REF DATA=ASQ Z1.4 | | | |030101|A| | | DOCUMENT REF DATA=MIL-STD-129 | | |R |180524|A| | | DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | DOCUMENT REF DATA=MIL-C-915 |0002| |A |700925|A| | | DOCUMENT REF DATA=ANSI 14.5 | | |M |940101|A| | | DOCUMENT REF DATA=DOD-STD-2101 | | | |790510|A| | | DOCUMENT REF DATA=MIL-S-8660 | | |C |990930|A| 2| | DOCUMENT REF DATA=MIL-I-16923 | | |H |910813|A| | | DOCUMENT REF DATA=MIL-C-22520 |0001| |C |810706|A| 2| | DOCUMENT REF DATA=MIL-STD-100 | | |E |920303|A| |01| DOCUMENT REF DATA=MIL-HDBK-454 | | |B |070415|A| | | DOCUMENT REF DATA=ISO9001 | | | |010417|A| | | DOCUMENT REF DATA=NAVSEA S9320-AM-PRO-020/MLDGR2| | | |130801|D| | | 3. REQUIREMENTS 3.1 Design, Manufacture, and Performance - Except as modified herein, the CABLE ASSEMBLY SET furnished under this contract/purchase order shall meet the design, manufacture, and performance requirements specified on drawing ;53711 7339969-1; cage ;53711 7339969-1; . 3.1.1 ;PN: 7339969-1; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 3.4.1 NAVSEA S9320-AM-PRO-020/MLDG - Manufacture of this item requires vendor certification in accordance with NAVSEA S9320-AM-PRO-020/MLDG. 3.5 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the
The rest of the text is on SAM.gov.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Presolicitation | October 13, 2026 | November 29, 2026, 11:00 PM ET |
| Solicitation | October 28, 2026 | November 30, 2026, 1:00 PM ET |
| Solicitation | November 1, 2026 | November 30, 2026, 2:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.