Notices · Presolicitation
Presolicitation Notice – Sole-Source Requirement for SNC Precision Approach Radar (PAR) AN/SPN-35E Landing System Upgrade Program (LSUP) Basic Ordering Agreement (BOA) Task Order (TO).
Closed. Responses were due November 12, 2026, 3:00 PM ET.
| Solicitation number | N00421-26-RFPREQ-TW00000-1864 |
|---|---|
| Notice type | Presolicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE NAVY, NAVAL AIR WARFARE CENTER AIR DIV |
| Set-aside | Not listed |
| NAICS | 541330 Engineering Services SBA size standard: $25.5M average annual receipts; exception for Military and Aerospace Equipment and Military Weapons: $47M average annual receipts; exception for Contracts and Subcontracts for Engineering Services Awarded Under the National Energy Policy Act of 1992: $47M average annual receipts; exception for Marine Engineering and Naval Architecture: $47M average annual receipts |
| Product or service code | AC33 National Defense R&D Services; Defense-Related Activities; Experimental Development |
| Place of performance | Sparks, NV, USA |
| Posted | October 26, 2026 |
| Response due | November 12, 2026, 3:00 PM ET |
Who holds the work now
Largest current award in NAICS 541330 at the Department of the Navy, by dollars obligated: ELECTRIC BOAT CORPORATION, current end date December 31, 2031. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read N00421-26-RFPREQ-TW00000-1864 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The NAWCAD WOLF Air Traffic Control and Landing Systems (ATC&LS) Division, operating under the oLSI® model, is the In-Service Engineering Activity (ISEA) for all U.S. Navy ATC&LS. The ATC&LS Division has a requirement to upgrade the Precision Approach Radar (PAR) AN/SPN-35E Landing System Upgrade Program (LSUP). The ATC&LS Division, operating under the oLSI® model, has requirements for project management, systems engineering, hardware engineering, software engineering, integration and test, Engineering Development Modules (EDMs), qualification testing and analysis, and logistics for the PAR AN/SPN-35E LSUP upgrade. This task order will have CPFF Completion CLINSs only. The requirement includes: Anticipated Period of Performance: May 2027 – May 2032 Anticipated Place of Performance: 100% of work will be performed at Contractor site.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Presolicitation | October 26, 2026 | November 12, 2026, 3:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.