Notices · Solicitation
Temporary Dehumidification System Rental
Closed. Responses were due November 16, 2026, 11:00 AM ET.
| Solicitation number | N3904026Q3149 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE NAVY, PORTSMOUTH NAVAL SHIPYARD GF |
| Set-aside | None (full and open competition) |
| NAICS | 532490 Other Commercial and Industrial Machinery and Equipment Rental and Leasing SBA size standard: $40M average annual receipts |
| Product or service code | W043 Lease or Rental of Equipment: Pumps and Compressors |
| Place of performance | Kittery, ME 03904, USA |
| Posted | November 9, 2026 |
| Response due | November 16, 2026, 11:00 AM ET |
Who holds the work now
Largest current award in NAICS 532490 at the Department of the Navy, by dollars obligated: UNITED RENTALS (NORTH AMERICA), INC., current end date January 17, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read N3904026Q3149 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
Portsmouth Naval Shipyard (PNSY) is seeking to lease a Desiccant Climate Controlled Unit (DCCU) system to provide dry and tempered process air for conditioning various spaces used for industrial applications. The system must include multiple DCCU’s, a chiller, chilled water pump, chilled water hose manifolds, hose assemblies as well as the associated onboard controls to operate both the chilled water system and DCCU’s. The intent of the chiller, pump, hose assemblies, manifolds and ancillary components is to establish a temporary chilled water system which serves all of the DCCU’s pre-cooling and post-cooling coils. All equipment conveying air to and from the industrial space must be pre-wired with remote E-Stop capability in order to provide a means to secure airflow in the event of an emergency response. Each DCCU and Chiller must be frame/skid mounted and meet the lifting & handling requirements as defined in the specification. Period of Performance Base: 12/14/2026 – 12/12/2027 (52 Weeks) , Equipment (DH-01 through DH-04) Base: 4/5/2027 – 10/3/2027 (26 Weeks) , Equipment (DH-05 through DH-14) Option 1: 12/13/2027 - 10/15/2028 (44 weeks) , Equipment (DH-01 through DH-04) Option 2: 10/16/2028 – 11/12/2028 (4 weeks) , Equipment (DH-01 through DH-04) Place of Performance: Portsmouth Naval Shipyard (PNSY), Maine
Attachments
SAM.gov lists 8 files with this notice. Open them on SAM.gov, or ask Claude to read them.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | November 9, 2026 | November 16, 2026, 11:00 AM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.