Notices · Combined Synopsis/Solicitation
Coso Microearthquake Network Modernization Study
Closed. Responses were due July 31, 2026, 5:00 PM ET.
| Solicitation number | N3943026R7003 |
|---|---|
| Notice type | Combined Synopsis/Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE NAVY, NAVFAC SYSTEMS AND EXP WARFARE CTR |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 541330 Engineering Services SBA size standard: $25.5M average annual receipts; exception for Military and Aerospace Equipment and Military Weapons: $47M average annual receipts; exception for Contracts and Subcontracts for Engineering Services Awarded Under the National Energy Policy Act of 1992: $47M average annual receipts; exception for Marine Engineering and Naval Architecture: $47M average annual receipts |
| Product or service code | B599 Other Special Studies and Analysis |
| Place of performance | 93555 |
| Posted | July 19, 2026 |
| Response due | July 31, 2026, 5:00 PM ET |
Who holds the work now
Largest current award in NAICS 541330 at the Department of the Navy, by dollars obligated: ELECTRIC BOAT CORPORATION, current end date December 31, 2031. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read N3943026R7003 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
This requirement is to conduct a comprehensive engineering study of the current microearthquake (MEQ) network. The contractor shall perform a complete site survey and analysis of the existing network, which includes approximately 15 permanent seismic monitoring stations, 1 temporary seismic monitoring station, the Joshua Ridge repeater site, and the central data acquisition and processing site at the Navy Geothermal Program Office (GPO) office building at NAWSCL. The primary deliverable is a final Network Upgrade Plan and Cost Analysis Report. This report must provide a detailed plan, including a Plan of Action and Milestones (POAM), and a corresponding Rough Order of Magnitude (ROM) cost estimate for the full modernization of the network hardware, software, and communications infrastructure. The analysis must be objective, impartial, and vendor-agnostic.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Combined Synopsis/Solicitation | July 14, 2026 | July 31, 2026, 5:00 PM ET |
| Combined Synopsis/Solicitation | July 19, 2026 | July 31, 2026, 5:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.