Z--Repair Parapet Wall Beach Hall Building 291
Closed. Responses were due December 15, 2017, 12:00 AM ET.
| Solicitation number | N4008018RTBD2 |
|---|---|
| Notice type | Sources Sought |
| Agency | DEPT OF DEFENSE, DEPT OF THE NAVY, NAVFACSYSCOM WASHINGTON |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 236220 Commercial and Institutional Building Construction SBA size standard: $45M average annual receipts |
| Product or service code | Z |
| Place of performance | Not listed |
| Posted | November 21, 2017 |
| Response due | December 15, 2017, 12:00 AM ET |
Who holds the work now
Largest current award in NAICS 236220 at the Department of the Navy, by dollars obligated: BLACK CONSTRUCTION-TUTOR PERINI JV, current end date June 24, 2031. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read N4008018RTBD2 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
This Sources Sought is for additional repairs needed to Beach Hall (Building 291). The requirement is based on a survey previously conducted that identified an unstable parapet wall as a potential life safety hazard and source of water intrusion. The survey was performed under a previously awarded contract. The additional repairs discovered directly affect the ability to perform the work under the aforementioned contract which is currently under a suspension of work. The scope of work includes deconstructing the existing parapet wall around the high roof. While deconstructing the existing parapet, care should be taken to save as much of the existing brick as possible for use in the reconstruction of the parapet wall. The new parapet wall is to be a solid reinforced masonry wall with face brick on the exterior and reinforced CMU block on the interior side. Collar joint between the CMU and brick is to be grouted solid. Roof repairs including replacement of flashing plies where the roof meets the parapet wall will be required around the majority of the perimeter. Contractors must be able to complete the contract work within 180 days.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Sources Sought | November 21, 2017 | December 15, 2017, 12:00 AM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.