Notices · Combined Synopsis/Solicitation
NH100 Engine Control Unit Replacement
Open. Responses are due in 7 days, on December 4, 2026, 1:00 PM ET.
| Solicitation number | N4008527R9006 |
|---|---|
| Notice type | Combined Synopsis/Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE NAVY, NAVFACSYSCOM MID-ATLANTIC |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 236220 Commercial and Institutional Building Construction SBA size standard: $45M average annual receipts |
| Product or service code | Z2DA Repair or Alteration of Hospitals and Infirmaries |
| Place of performance | Camp Lejeune, NC 28547, USA |
| Posted | November 24, 2026 |
| Response due | December 4, 2026, 1:00 PM ET |
Who holds the work now
Largest current award in NAICS 236220 at the Department of the Navy, by dollars obligated: BLACK CONSTRUCTION-TUTOR PERINI JV, current end date June 24, 2031. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read N4008527R9006 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
From the attachments
Pulled by AI from all 6 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.
| Evaluation | lowest price RFP 270700.pdf, page 2: "Basis for Award: Lowest Price" |
|---|---|
| Questions due | November 30, 2026, 2:00 PM EST RFP 270700.pdf, page 3: "The cut off for RFIs is 11/30/2026 by 2:00 PM EST in order to process all inquiries by the proposal due date." |
| Site visit | November 16, 2026 RFP 270700.pdf, page 2: "Site visit scheduled for November 16, 2026, at 0900. Contractors shall meet at the Facilities building, NH118, Camp Lejeune, NC." |
| Site visit | mandatory NH100 REPLACE ENGINE CONTROL UNITS ON 3 GENERATORS revised.…, page 3: "The Contractor shall: a. Make a site visit and take such other steps as may be reasonably necessary to ascertain the nature and location of the work" |
| Bonding | Performance bond Combined DIV 01 specs small projects.pdf, page 133: "The Performance Bond must remain effective throughout the construction period" |
| Contract type | firm-fixed-price Combined DIV 01 specs small projects.pdf, page 8: "Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts." |
The notice text
The text below is SAM.gov's own, unedited.
Attachments
The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.
- Amend 0004.pdf
- Combined DIV 01 specs small projects.pdf
- Amend 0003.pdf
- RFP 270700.pdf
- NH100 REPLACE ENGINE CONTROL UNITS ON 3 GENERATORS revised.pdf
- Amend 0002.pdf
- Amend 0001.pdf
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Combined Synopsis/Solicitation | November 12, 2026 | December 4, 2026, 1:00 PM ET |
| Combined Synopsis/Solicitation | November 15, 2026 | December 4, 2026, 1:00 PM ET |
| Combined Synopsis/Solicitation | November 18, 2026 | December 4, 2026, 1:00 PM ET |
| Combined Synopsis/Solicitation | November 19, 2026 | December 4, 2026, 1:00 PM ET |
| Combined Synopsis/Solicitation | November 24, 2026 | December 4, 2026, 1:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.