Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Presolicitation

NAVFACSYSCOM NORTHWEST Request for Information (RFI) Shipyard Infrastructure and Optimization Program (SIOP) P454 Multi-Mission Dry Dock (M2D2)

Closed. Responses were due April 17, 2026, 7:00 PM ET.

Solicitation numberN4425526RF011
Notice typePresolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE NAVY, NAVFACSYSCOM NORTHWEST
Set-asideNot listed
NAICS237990 Other Heavy and Civil Engineering Construction
SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2)
Product or service codeZ2ED Repair or Alteration of Ship Construction and Repair Facilities
Place of performance98314
PostedMarch 2, 2026
Response dueApril 17, 2026, 7:00 PM ET

Who holds the work now

Largest current award in NAICS 237990 at the Department of the Navy, by dollars obligated: DRAGADOS/HAWAIIAN DREDGING/ORION JV, current end date September 30, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read N4425526RF011 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The Multi-Mission Dry Dock (M2D2) constructs a reinforced concrete pressure relieved multi-mission dry dock with caisson to support the USS FORD (CVN-78) class and USS NIMITZ (CVN-68) class nuclear aircraft carriers, as well as all fleet nuclear submarine classes. Construction utilizes upland groundwater cutoff walls and cofferdam systems and includes bulkheads, quay walls, stairs, enclosed utility galleries, electrical and mechanical utility tunnels, drainage tunnels, discharge tunnels and saltwater system intake(s), closed loop cooling system, flooding and dewatering systems, passenger and freight elevators, vessel mooring hardware, bollards, capstans, perimeter safety railing, temporary services support hangers and area lighting. Work also includes fire protection, information technology, automated control systems compatible with the Shipyard and Naval Base Kitsap (NBK) Supervisory Control and Data Acquisition System (SCADA), dry dock process water collection system, and the process water/oily waste treatment system. Additionally, construction will include 40-foot gauge portal crane tracks, sanitary sewer, mechanical and electrical utilities, saltwater and freshwater fire protection, information and communications systems, and lighting. Procurement of equipment including a ship-style floating caisson gate and electrified 40-foot gauge portal cranes may also be included.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationMarch 2, 2026April 17, 2026, 7:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.