Notices · Presolicitation
Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
Open. No response date is listed. Check the notice text for how and when to respond.
| Solicitation number | PANNWD26P0000030936 |
|---|---|
| Notice type | Presolicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W071 ENDIST KANSAS CITY |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 237990 Other Heavy and Civil Engineering Construction SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2) |
| Product or service code | Z2PZ Repair or Alteration of Other Non-Building Facilities |
| Place of performance | Not listed |
| Posted | October 29, 2026 |
| Response due | Not listed |
Who holds the work now
Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read PANNWD26P0000030936 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The U.S. Army Corps of Engineers, Kansas City District, anticipates issuing Request for Proposals No. W912DQ27RA004 for a total small-business set-aside Multiple Award Task Order Contract (MATOC) supporting the Missouri River Bank Stabilization and Navigation Project. The requirement includes the repair, modification, and construction of river-training structures, including dikes and revetments, through placement of quarry-run stone and excavation of notches. Work will be performed by floating plant along the Missouri River between River Miles 0-542. The scope of work includes, but is not limited to, the construction, modification, and repair of stone dikes and revetments; bank paving and hard points; revetment overlays; and excavation of notches. The work requires the capability of mobilizing, loading, and unloading barges from accessible quarries with graded stone along the Missouri River. Structures are located between the high banks of the Missouri River to include side channel chutes. All work to be performed will be completed by floating plant as no land access will be available. Stone is typically placed by way of track-hoe from a work barge. Contractor equipment shall be capable of accessing designated structures in water depths of four feet or greater.The Government anticipates awarding four (4) to five (5) firm-fixed-price indefinite-delivery, indefinite-quantity (IDIQ) contracts within the MATOC. The Government also anticipates awarding one concurrent seed task order within the MATOC pool. The MATOC will have a shared aggregate maximum capacity of $50,000,000 for all awards, consisting of a three-year base ordering period and two one-year option periods. The minimum guarantee is $2,500 for each awarded IDIQ contract.This acquisition is a total small-business set-aside under North American Industry Classification System (NAICS) code 237990, Other Heavy and Civil Engineering Construction. The applicable small-business size standard is $45 million.The solicitation is anticipated to be issued on or about January 2027. The solicitation will establish the proposal due date and time; the Government anticipates allowing approximately 30 calendar days for proposal submission. A bid guarantee is required with the seed task order proposal in an amount equal to 20 percent of the proposed seed task order price or $3,000,000, whichever is less. The successful seed task order awardee will be required to furnish performance and payment bonds, each in the amount of 100 percent of the seed task order award amount, before issuance of the Notice to Proceed. Currently, a Pre-Solicitation Conference is not scheduled. If the Government decides to hold a conference, this announcement will be amended accordingly.The solicitation will use a best-value tradeoff source-selection process. The Government intends to award without discussions but reserves the right to conduct discussions if determined necessary. The solicitation will identify the official posting location and the authorized electronic proposal-submission method. Electronic proposals will be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Portal. Offerors are responsible for establishing and maintaining the required PIEE access, including the Proposal Manager role, sufficiently in advance of the proposal due date.Notice is given that it has been determined a consolidation of contract requirements is necessary and justified for this action. The determination will be published with the solicitation.Offerors must maintain an active System for Award Management registration and current representations and certifications, as required by the solicitation and applicable regulations.Prospective offerors are responsible for monitoring the official posting location for amendments and other updates.Prospective offerors shall submit contracting and technical questions through ProjNet Bidder Inquiry. The solicitation will provide the Bidder Inquiry Key and establish the deadline for questions. The Government will address questions through formal solicitation procedures.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Presolicitation | October 29, 2026 |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.