Notices · Combined Synopsis/Solicitation
Electric Power Resiliency Building 56
Open. Responses are due in 12 days, on December 9, 2026, 1:00 PM ET.
| Solicitation number | SP330027Q0012 |
|---|---|
| Notice type | Combined Synopsis/Solicitation |
| Agency | DEPT OF DEFENSE, DEFENSE LOGISTICS AGENCY, DLA DISTRIBUTION |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 238210 Electrical Contractors and Other Wiring Installation Contractors SBA size standard: $19M average annual receipts |
| Product or service code | Z2GZ Repair or Alteration of Other Warehouse Buildings |
| Place of performance | 95304 |
| Posted | November 15, 2026 |
| Response due | December 9, 2026, 1:00 PM ET |
Who holds the work now
Largest current award in NAICS 238210 at the Defense Logistics Agency, by dollars obligated: CAS FSE JV II LLC, current end date September 12, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read SP330027Q0012 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
Amendment 0003 is being issued to change the original SF1449 cover page to correct Block 8 from 12/07/2026 to 12/09/2026 as provided for in the rest of the solicitation. Amendment 0002 is being issued to correct faulty upload of Attachment 2.Amendment 0001 is being issued to add Attachment 2, which is the Statement of Work. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at the Defense Distribution San Joaquin California. Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaic system for building 56. but not limited to: The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed the listing and qualification tests. All design and installation shall comply with the most recent version of each document. The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor. The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required. The PV systems shall be consistent with and adhere to all California Building Codes and standards, the California Solar Initiative program, and any and all CEC technical and installation specifications and guidelines. There is one existing electric substation feeding building 56 with a capacity: 12470/408V, 3000KVA transformer. Switchgear is rated: 4000A bus bar and four existing 1200A frame size circuit breaker spaces are available.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Combined Synopsis/Solicitation | November 9, 2026 | December 9, 2026, 1:00 PM ET |
| Combined Synopsis/Solicitation | November 11, 2026 | December 9, 2026, 1:00 PM ET |
| Combined Synopsis/Solicitation | November 12, 2026 | December 9, 2026, 1:00 PM ET |
| Combined Synopsis/Solicitation | November 15, 2026 | December 9, 2026, 1:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.