Notices · Solicitation
Contractor-owned, Contractor-operated (COCO) bulk retail services at two locations on Fort Bragg, NC.
Open. Responses are due in 10 days, on December 7, 2026, 9:00 AM ET.
| Solicitation number | SPE60326R0526 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEFENSE LOGISTICS AGENCY, DLA ENERGY |
| Set-aside | Not listed |
| NAICS | 493190 Other Warehousing and Storage SBA size standard: $36.5M average annual receipts |
| Product or service code | M1NA Operation of Fuel Supply Facilities |
| Place of performance | Fort Bragg, NC, USA |
| Posted | November 23, 2026 |
| Response due | December 7, 2026, 9:00 AM ET |
Who holds the work now
Largest current award in NAICS 493190 at the Defense Logistics Agency, by dollars obligated: DGCI CORPORATION, current end date June 29, 2030. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read SPE60326R0526 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
From the attachments
Pulled by AI from 9 of 15 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.
| Evaluation | lowest price technically acceptable Attachment III - Past Performance Questionnaire Form.pdf, page 2: "under the DOD’s streamlined process for evaluating Past Performance under Lowest Price Technically Acceptable, ratings of Acceptable and Unacceptable" |
|---|---|
| Evaluation factors | Technical sub-factors: Staffing, Operations, Maintenance, Contractor-Furnished Facilities and Equip… Attachment XV-Preproposal Questions and Answersfinal.pdf, page 25: "but the listed sub-factors appear to be four: Staffing, Operations, Maintenance, and Contractor-Furnished Facilities and Equipment." |
| Evaluation factors | Factor 2: Past Performance Attachment XV-Preproposal Questions and Answersfinal.pdf, page 27: "Yes that is acceptable, according to Section M, Factor 2: Past Performance." |
| Past performance | North Carolina licensed plumbing installer with 10 years of experience Att VIII - Installation Design Guide (Condensed) (30Oct2026…, page 51: "Engage a North Carolina Licensed Plumbing installer with not less than 10 years demonstrable consecutive successful experience in" |
| Past performance | Concrete sidewalks and curbs and gutters installer with 5 years of experience Att VIII - Installation Design Guide (Condensed) (30Oct2026…, page 45: "Engage a concrete sidewalks and curbs and gutters installer with not less than 5 years consecutive successful experience" |
| Past performance | not less than 5 years consecutive successful experience in Painting and Coating applications simila… Att VIII - Installation Design Guide (Condensed) (30Oct2026…, page 74: "Engage a Painting and Coating applicator with not less than 5 years consecutive successful experience in Painting and Coating applications similar in size and type" |
| Past performance | 2 more in the files, not shown here. |
| Contract type | firm-fixed-price Attachment XV-Preproposal Questions and Answersfinal.pdf, page 14: "All after hours support will be the Contractor’s responsibility under firm fixed price contract." |
The notice text
The text below is SAM.gov's own, unedited.
Attachments
The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.
- Att VIII - Installation Design Guide (Condensed) (30Oct2026).pdf
- SPE60326R0526 0001.pdf
- Attachment IV- PP Consent Form.pdf
- Attachment III - Past Performance Questionnaire Form.pdf
- SPE603R26R0526 _ Amendment 0008.pdf
- Attachment II - DLA Energy Quality Assurance Provisions (QAPS).pdf
- Attachment XV-Preproposal Questions and Answersfinal.pdf
- SF30_Amendment 0004.pdf
- Att XIV - East Bragg Site Env Condition of Property(ECP).pdf
- ATT XIII - 82nd ABN Site Env Condition of Property(ECP).pdf
- Attachment VI - Ft Bragg Fuel Facility Site Data Addendum.pdf
- Amendment 0007.pdf
- Amendment 0003.pdf
- Attachment IX - WD 2015-4377 rev 31.pdf
- 091526_SF_30 Amendment 0005.pdf
- SPE603-26-R-0526 (Ft. Bragg).pdf
- Att 1 - Ft Bragg COCO Services PWS (30Oct2026) changes highlited.pdf
- Amendment 0006.pdf
- SF_30 Amendment 0002.pdf
- Attachment V - Past Performance Reference List.pdf
- Att VII - Ft Bragg Fuel Facility Construction Addendum v4.pdf
- Att XII - Draft Easement v2.pdf
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | August 3, 2026 | August 26, 2026, 9:00 AM ET |
| Solicitation | August 6, 2026 | August 31, 2026, 9:00 AM ET |
| Solicitation | August 18, 2026 | August 31, 2026, 9:00 AM ET |
| Solicitation | August 19, 2026 | September 15, 2026, 9:00 AM ET |
| Solicitation | September 14, 2026 | October 2, 2026, 5:00 PM ET |
| Solicitation | September 28, 2026 | October 30, 2026, 5:00 PM ET |
| Solicitation | October 27, 2026 | November 30, 2026, 5:00 PM ET |
| Solicitation | November 23, 2026 | December 7, 2026, 9:00 AM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.