Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

Amended FINAL RFP - Landing Gear Collaborative Supply Chain Integration II

Open. Responses are due in 94 days, on March 1, 2027, 7:00 PM ET.

Solicitation numberSPRHA1-26-R-1003
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEFENSE LOGISTICS AGENCY, DLA AVIATION AT OGDEN, UT
Set-asideSmall Business Set Aside - Total (SBA)
NAICS336413 Other Aircraft Part and Auxiliary Equipment Manufacturing
SBA size standard: 1,250 employees (SBA footnote 7)
Product or service code1620 Aircraft Landing Gear Components
Place of performanceUSA
PostedNovember 22, 2026
Response dueMarch 1, 2027, 7:00 PM ET

Who holds the work now

Largest current award in NAICS 336413 at the Defense Logistics Agency, by dollars obligated: NORTHROP GRUMMAN SYSTEMS CORPORATION, current end date May 13, 2029. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read SPRHA1-26-R-1003 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from 8 of 16 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

ClearanceConfidential security clearance for system users
AMENDED Attachment 2 - TRD 102926.pdf, page 13: "All systems require the contractor’s system user to be a US citizen and able to obtain a confidential security clearance."
Past performance10 years related manufacturing; 5 years direct landing gear manufacturing (Principal Engineer)
AMENDED Attachment 2 - TRD 102926.pdf, page 12: "The Principal Engineer shall have a minimum of 10 years of related manufacturing experience with five years of direct landing gear manufacturing experience."
Contract typeindefinite-delivery, indefinite-quantity (IDIQ)
SPRHA126R1003.pdf, page 3: "The purpose of this solicitation is to establish an Indefinite Delivery Indefinite Quantity (IDIQ) Contract for the purchase of landing gear spares."
Contract typefixed-price with economic price adjustment
SPRHA126R1003.pdf, page 25: "52.216-2 ECONOMIC PRICE ADJUSTMENT--STANDARD SUPPLIES (NOV 2021) (IAW FAR 16.203-4(a))"

The notice text

The text below is SAM.gov's own, unedited.

23 November 2026 Update: Made Interested Vendors List available for viewing by other vendors 29 October 2026 Update: RFP Amendment 0001 posted with updated attachments. The only attachments with changes are: Attachment 1 - TEP Worksheet Attachment 2 - TRD Attachment 3 - Section L Attachment 4 - Section M All other attachments remain as posted in original RFP. Response date of 1 March 2027 is unchanged. Please sign and return Amendment along with proposal. RFP Description: Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2) Overview Defense Logistics Agency (DLA) Aviation at Ogden is issuing this formal solicitation for the Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2) program. This requirement is being competed as a 100% Small Business Set-Aside under full trade-off source selection procedures. Solicitation Number: SPRHA1-26-R-1003 Set-Aside Status: 100% Small Business Set-Aside NAICS Code: 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing PSC Code: 1620 - Aircraft Landing Gear Components Contract Type: Single-Award ID/IQ (Firm-Fixed-Price with EPA) Period of Performance: 10 Years (5-Year Base + One 5-Year Option) Scope of Work The LG-CSCI2 program provides performance-based supply chain support for competitive landing gear components associated with USAF aircraft. The scope encompasses approximately 2,800 National Item Identification Numbers (NIINs), including USAF Depot Level Reparables (DLRs) and DLA consumables. These range from simple consumable items to complex DLRs requiring forgings and long lead times. The Prime Contractor will provide end-to-end supply chain management, engineering oversight, quality assurance, and procurement. Key program objectives include: Achieving a 95% On-Time Delivery (OTD) rate for DLA-managed parts and a 90% OTD rate for USAF-managed parts. Reducing Production Lead Times (PLTs) across the supply chain by a minimum of 25%. Executing strategic raw material purchasing, forging die management, and Obsolescence/DMSMS management. Solicitation Attachments & Instructions The official Request for Proposal (RFP), Technical Requirements Document (TRD), and other applicable attachments are provided in this posting. Note on Bid Sets: Bid sets for the individual NIINs are not hosted directly on SAM.gov. They will be mailed via removable drives to interested parties. Please provide your firm's mailing address to the DLA Contracting POCs listed below to request a removable drive be mailed to you. Points of Contact: Primary: Nathan Flinders, Contracting Officer (nathan.flinders@dla.mil) Secondary: Justin Rogers, Contracting Officer (justin.rogers.28@us.af.mil)

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationAugust 18, 2026March 1, 2027, 7:00 PM ET
SolicitationAugust 18, 2026March 1, 2027, 7:00 PM ET
SolicitationOctober 28, 2026March 1, 2027, 7:00 PM ET
SolicitationNovember 22, 2026March 1, 2027, 7:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.