VGLZ 182035 REPAIR BASE PERIMETER ROAD
Open. No response date is listed. Check the notice text for how and when to respond.
| Solicitation number | W50S8526BA001 |
|---|---|
| Notice type | Presolicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W7NF USPFO ACTIVITY MIANG 127 |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 237310 Highway, Street, and Bridge Construction SBA size standard: $45M average annual receipts |
| Product or service code | Y1LB Construction of Highways, Roads, Streets, Bridges, and Railways |
| Place of performance | 48045 |
| Posted | March 24, 2026 |
| Response due | Not listed |
Who holds the work now
Largest current award in NAICS 237310 at the Department of the Army, by dollars obligated: SOUTHWEST VALLEY CONSTRUCTORS CO, current end date March 29, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W50S8526BA001 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements will apply. All work will be coordinated with Base Operations. A Macomb County Soil Erosion Permit will be required for this project. The Contractor shall obtain, pay for, and follow the requirements of this permit. The work will consist of Construction of new 2 and 3 lane roads. The requirement includes full-depth pavement repairs, mill/overlay, crack repairs, and work along the entire Perimeter Road and Jefferson Ave. All work will be completed IAW drawings Repair Perimeter Rd VGLZ 182035. Installation of subsurface edge drainage for all new pavement sections. Localized grading of the project site to address current inadequate drainage. New paint and markings on all new pavements. The Contractor must maintain a constant flow of traffic during construction. Base perimeter road surfacing to be primarily of HMA Pavement. Existing base perimeter road distance to be resurfaced unofficially is 4.2 miles of primarily two and three lane road, with Jefferson Ave from Main Gate to Wilbur Wright Blvd. being three lanes. Those three lanes make up one mile of the projects 4.2 total miles. Contractor to remove and reinstall steel wedge barriers and jersey barriers throughout construction per the direction of SANGB Security Staff. Steel barriers to be reinstalled at grade to match pre-construction condition. Interested vendors should respond to this sources sought announcement through the Procurement Integrated Enterprise Environment (PIEE) solicitation module by providing a full capabilities statements, socio-economic status, applicable NAICS codes, prior experience in road construction and repair, past performance, government contract numbers for highway work, bonding status letter from financial institution, Please see Sources Sought Notice attached with this announcement. (See attachments for further information)
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Sources Sought | February 3, 2026 | March 6, 2026, 12:00 PM ET |
| Sources Sought | February 5, 2026 | February 20, 2026, 12:00 PM ET |
| Sources Sought | March 3, 2026 | March 17, 2026, 12:00 PM ET |
| Presolicitation | March 24, 2026 |