Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

Repair and Widen Taxiways Phase III, PSTE 162013

Closed. Responses were due August 15, 2026, 4:00 PM ET.

Solicitation numberW50S9526BA002
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W7NZ USPFO ACTIVITY SCANG 169
Set-asideSmall Business Set Aside - Total (SBA)
NAICS237310 Highway, Street, and Bridge Construction
SBA size standard: $45M average annual receipts
Product or service codeZ1BD Maintenance of Airport Runways and Taxiways
Place of performance29044
PostedAugust 14, 2026
Response dueAugust 15, 2026, 4:00 PM ET

Who holds the work now

Largest current award in NAICS 237310 at the Department of the Army, by dollars obligated: SOUTHWEST VALLEY CONSTRUCTORS CO, current end date March 29, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W50S9526BA002 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

This update is to post bid abstract reflecting bid opening results to include the certified Independent Government Estimate; no changes to this solicitation or solicitation response period have been executed.This update is to post bid abstract reflecting bid opening results; no changes to this solicitation or solicitation response period have been executed. This solicitation response date has been extended to 2 July 2026 at 2PM Eastern Time. This is an update to issue Amendment 0001 along with Attachments 3 and 4. Also included is a consolidated solicitation with changes current through Amendment 0001.This is an update to provide interested parties with information from the pre-bid solicitation conference and site visit conducted June 10, 2026. The list of attendees and the agency slideshow are included by attachment for reference purposes only. The USPFO for South Carolina intends to issue an Invitation for Bid to award a single firm fixed- price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to repair and expand airfield pavements to meet standard by utilizing conventional design and construction methods at McEntire JNGB. The scope of this project will consist of the removal of existing substandard concrete and asphaltic pavement and the installation of new base course, new concrete pavement (PCC), storm water drainage improvements, relocate taxiway edge lights, signage and paint taxi lines for base assigned and transient aircraft. All new pavements will be compatible with applicable Department of Defense (DoD), Air Force, and installation design standards and criteria. In addition, local materials and construction techniques shall be used where cost effective. The work is located at McEntire Joint National Guard Base near Eastover in Richland County, South Carolina. The award is anticipated to consist of the following line items (CLINs): CLIN 0001: Base Bid, in addition to the base work described above, the solicitation will include the following optional line items: CLIN 0002: Replace all Signs and Lights CLIN 0003: Reseal Ready Alert Apron. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 237310, with a size standard of $45,000,000.00. The magnitude of the project is between $10,000,000.00 and $25,000,000.00. The project is anticipated to occur in two stages with a total contract duration of 365 days after notice to proceed (NTP). The first stage will consist of an anticipated 180-day pre-construction period for submittal approval, testing, mix designs, submission of required permits, etc. The second stage will consist of an anticipated 180-days of actual construction. No work shall begin on stage two until the government has fully accepted stage one and issued a separate NTP (this may not start immediately following stage one completion). *NOTE: The NTP for stage two construction will contain either the number of days remaining from the original 365 days after government acceptance of stage one or 180 days, whichever is greater. *NOTE: If option(s) are unilaterally exercised within the timeframe noted in FAR 52.217-7 they shall be completed during the second stage of the Base Bid 180 days of actual construction and will not extend total period of performance. Your attention is directed to FAR Clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states ???????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor???????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????s 85 percent subcontract amount that cannot be exceeded???????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????. In accordance with FAR 36.211(b), the following information is provided:(1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.(2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. Prospective bidders are highly encouraged to attend a pre-bid conference and site visit: See Section 00 21 00 - Instructions, paragraph 3 of solicitation for time and date, at McEntire Joint National Guard Base 169th FW, CE Conference Room, 1325 South Carolina Road, Building 1071, Eastover, SC 29044. Interested contractors shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-bid conference. All questions for the pre-bid conference must be submitted 5 calendar days prior to the conference via email to jonathan.bailey.28@us.af.mil and badri.francis.1@us.af.mil. Submit Proposals no later than: See Box 13 and any amendments for Proposal Due Date. Interested offerors must be registered in the System for Award

The rest of the text is on SAM.gov.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationMay 18, 2026June 23, 2026, 2:00 PM ET
SolicitationJune 15, 2026June 23, 2026, 2:00 PM ET
SolicitationJune 17, 2026June 25, 2026, 2:00 PM ET
SolicitationJune 24, 2026July 2, 2026, 2:00 PM ET
SolicitationJuly 1, 2026July 2, 2026, 6:00 PM ET
SolicitationAugust 14, 2026August 15, 2026, 4:00 PM ET
Award NoticeAugust 20, 2026

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.