Notices · Sources Sought
FMF EC B-HAC Insular Air-Naval Station Hanger Renovation & Facilities Expansion U.S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA)
Closed. Responses were due November 12, 2026, 3:00 PM ET.
| Solicitation number | W51DQV27S1CVC |
|---|---|
| Notice type | Sources Sought |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W2SR ENDIST CARIBBEAN(PROVIS) |
| Set-aside | Not listed |
| NAICS | 236220 Commercial and Institutional Building Construction SBA size standard: $45M average annual receipts |
| Product or service code | Y1BZ Construction of Other Airfield Structures |
| Place of performance | San Cristobal Island, ECU |
| Posted | November 9, 2026 |
| Response due | November 12, 2026, 3:00 PM ET |
Who holds the work now
Largest current award in NAICS 236220 at the Department of the Army, by dollars obligated: WALSH - TURNER JV II, current end date April 7, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W51DQV27S1CVC in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
Amendment to the Sources Sought - November 10, 2026 The following questions have been added: How do our shipping restrictions affect your pricing, schedule, and risk? How does the Jones Act impact your logistics process, if at all? If regulations did not matter, what do you recommend to make the logistics and transportation process easier for US Government requirements? How does the Balance of Payments Program impact your list of suppliers? How frequent does the logistics process directly contribute to delays or cost increases? Have you lost revenue due to logistics delays/issues that could have been addressed earlier in the procurement process? Sources Sought Announcement FMF EC B-HAC Insular Air-Naval Station Hanger Renovation & Facilities Expansion U.S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA) ****SOURCES SOUGHT FOR MARKET RESEARCH PURPOSES ONLY**** This announcement seeks information from industry which will be used for preliminary planning purposes. No proposals are being requested or accepted with this announcement. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. NO SOLICITATION, SPECIFICATIONS OR DRAWINGS ARE AVAILABLE AT THIS TIME. 1. AGENCY: United States Army Corps of Engineers (USACE) Latin America and Caribbean District (SAA) 2. NAICS: 236220 - Commercial and Institutional Building Construction 3. PLACE OF PERFORMANCE: Insular Air-Naval Station (Estación Aeronaval Insular), San Cristobal Island, Galapagos Province, Ecuador. 4. ACQUISITION INFORMATION: The U.S. Army Corps of Engineers (USACE), Latin America and Caribbean District (SAA), is issuing this Sources Sought announcement to identify qualified, capable, and interested U.S. firms eligible to serve as prime contractors for a potential multi-phase Design-Build construction project at the Insular Air-Naval Station on San Cristóbal Island, Galápagos, Ecuador. The project is funded through Foreign Military Financing (FMF) and is subject to applicable Offshore Procurement (OSP) requirements. The anticipated acquisition will require an eligible U.S. firm to serve as the prime contractor, unless an exception or waiver is separately authorized by the appropriate approval authority. The results of this market research will inform the Government's acquisition strategy, procurement approach, assessment of U.S. contractor capabilities and interest, and evaluation of applicable OSP requirements. Limited U.S. contractor participation or competition does not, by itself, constitute approval of or establish entitlement to an OSP waiver. Any exception or waiver would require a separate determination and approval in accordance with applicable policies and procedures. Anticipated Contract Type: Firm-Fixed-Price (FFP) Design-Build (C-Contract) with a base requirement and option phases. Estimated Magnitude of Construction: $7million to $9 million Performance Period: 540 days after Notice to Proceed. Anticipated Award Date: Fiscal Year 2027 Quarter 3 In accordance with FAR 19.000(b)(1)(ii), the Procuring Contracting Officer (PCO) has elected not to apply FAR Part 19 (Small Business Programs) to this overseas procurement. Consequently, small business set-asides will not be utilized for this project in the Galapagos Islands, Ecuador. However, because this project is funded by Foreign Military Financing (FMF), standard statutory constraints require procurement from U.S. sources. All responsible U.S. sources—including both large and small business concerns—are highly encouraged to submit capabilities statements in response to this notice. The results of this market research will inform the Government's acquisition strategy, procurement approach, assessment of U.S. contractor capabilities and interest, and evaluation of applicable OSP requirements. Limited U.S. contractor participation or competition does not, by itself, constitute approval of or establish entitlement to an OSP waiver. Any exception or waiver would require a separate determination and approval in accordance with applicable policies and procedures. Foreign Military Financing (FMF) and Offshore Procurement (OSP): In accordance with Section 42(c) of the Arms Export Control Act (22 U.S.C. § 2791(c)), award is restricted to eligible U.S. firms, as an OSP determination has not been approved. The Government reserves the right to pursue an OSP determination if deemed in its best interest. U.S. prime contractors may utilize qualified local subcontractors, subject to applicable FMF and procurement requirements. 5. ANTICIPATED ACQUISITION STRATEGY: The final acquisition strategy will be determined based on the responses received from this Sources Sought notice, contractor availability, and stakeholder coordination. The Government is contemplating the following acquisition approaches: Primary Approach (Best Value Trade-Off (BVTO) Design-Build C-Contract with Options): Award a single Firm-Fixed-Price (FFP) Design-Build construction contract through a competitive Request for Proposals (RFP), utilizing a Lowest Price Technically Acceptable (LPTA) source selection approach, with options subject to funding availability. Base Requirement (Phases 1 & 2): Phase 1 – Hangar Renovation: Renovation and modernization of the existing aviation hangar to support Bell 430 rescue helicopters and Beechcraft King Air 350 aircraft. Phase 2 – Fuel Farm: Design and construction of a new fuel farm using a Design-Build-to-Budget (DB2B) approach, including demolition of the existing fuel facility. Option Package (Phase 3): Phase 3 – New Hangar: Design and construction of a new aviation hangar to support King Air 350 aircraft, exercisable based on funding availability and operational priorities. Offshore Procurement (OSP) Strategy Determination: U.S. Contractor Only Competition: If market research demonstrates sufficient interest and capability from responsible U.S. contractors capable of executing works in the Galapagos Islands, the solicitation may be restricted to U.S. firms in compliance with standard FMF guidelines. OSP Waiver / Unrestricted Competition: If responses indicate limited U.S. industry interest, severe logistical/cost premiums, or inadequate competition, USACE will utilize the findings of this market research to justify and process an FMF Offshore Procurement Waiver to allow foreign/host-nation firms to compete. 6. PROJECT DESCRIPTION: The contemplated scope consists of complete Design-Build to Budget (DB2B) services to include civil, geotechnical, structural, architectural, MEP (mechanical, electrical, plumbing), specialized fire suppression, aircraft maintenance utility integration, fuel containment/dispensing, demolition, and environmental protection compliant with both U.S. engineering standards (Unified Facilities Criteria - UFC) and host-nation Galapagos environmental regulations. The project is divided into three distinct phases of development. The Government has developed preliminary design documents to support the proposed requirements, which will serve as the basis for the contemplated Design-Build acquisition. The selected Design-Build contractor is anticipated to be responsible for completing the design and performing construction in accordance with the final contract requirements. Project Phase Phase 1 (Base) Primary Function/Facility: Existing Hangar Renovation (Supporting Bell 430 Rescue Helicopter & King Air 350) Key Technical Considerations: Design/Build (30%) documents for Renovation to the existing hanger for the Bell 430 rescue helicopter and King Air 350. Phase 2 (Base) Primary Function/Facility: New Aviation Fuel Farm & Legacy Demolition Key Technical Considerations: Design/Build (65%) documents for a new Fuel Farm and demo of the existing fuel farm Phase 3 (Option) Primary Function/Facility: New Aircraft Hangar (Supporting King Air SKA 350) Key Technical Considerations: Design/Build (65%) documents for a new Hangar for a new King Air SKA 3350 7. SOURCES SOUGHT: The purpose of this source sought is to gain knowledge of interest, capabilities and qualifications of contractors who have the capabilities to complete and perform contracts of this magnitude, and to address any questions, recommendations or concerns from Industry. The Government must ensure there is adequate competition among potential pool of responsible contractors. Prior Government contract work is not required for submitting a response under this Sources Sought announcement. The result of this market research will contribute to determining the method of procurement. 8. RESPONSES: The Capabilities Statement for this Sources Sought is not intended to be a Request for Proposal nor Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. It is to request statements regarding the company's ability to demonstrate existing-or-developed expertise and experience in relation to the areas specified herein. Any commercial brochures or currently existing marketing material may also be submitted. This synopsis is for information and planning purposes only and is neither to be construed as a commitment by the Government nor will the Government pay for information solicited. Respondents will not be notified of the results of the evaluation. Interested parties are requested to provide a capabilities statement addressing the following areas. Section 1: Company Information Company Name, Address, and Website Point of Contact (Name, Title, Phone, Email) CAGE Code and SAM UEI Number Business Size and Status (e.g., Small Business, Large Business) Bonding: What bonding or guarantee methods are available to your company to secure contract performance and protect downstream subcontractor/labor payments for a project located in Ecuador? Please specify if your company utilizes US Treasury-listed Surety Bonds, Ecuadorian Bank Letters of Guarantee (Carta Fianza), or Insurance-backed Guarantees (Póliza de Caución). Relevant NAICS Codes Is your company a U.S.-based firm interested in participating as the prime contractor for this project? (Yes/No) Section 2: Interest and Experience in Ecuador Please confirm your company's interest in performing a design-build construction project of this magnitude and complexity in Galapagos Province, Ecuador or similar remote area. Summary of prior construction experience in Ecuador or South America. Address our minimum operational needs of experience with: Ecuadorian construction standards (Código Ecuatoriano de la Construcción), professional licensing requirements (Colegio de Ingenieros del Ecuador / Colegio de Arquitectos del Ecuador); Local labor laws, and tax/customs processes (SENAE and SRI). Describe your firm's capability to obtain the necessary permits and licenses required for construction work in Ecuador and to comply with all applicable host nation laws and regulations. Discuss your firm's experience with international logistics, including the transportation of materials and equipment to project sites in South America. Discuss your firm’s familiarity with base security clearance procedures, host-nation military vetting, and port access protocols. Section 3: Design-Build Qualifications and Technical Capabilities Interested firms are requested to provide information demonstrating their qualifications, relevant experience, and technical capabilities to execute the proposed multi-phase Design-Build (D-B) construction project. 3.1 Design-Build Qualifications and Relevant Experience Provide a brief overview of your firm's Design-Build experience as a prime contractor. Describe your firm's proposed D-B delivery approach, including the use of in-house design capabilities, joint ventures, or partnerships with qualified U.S., Ecuadorian, or international Architect-Engineer (A-E) firms. Provide up to three (3) examples of relevant Design-Build construction projects completed within the past five (5) years. For each project, identify the project name, location, contract value,
The rest of the text is on SAM.gov.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Sources Sought | October 28, 2026 | November 12, 2026, 3:00 PM ET |
| Sources Sought | November 9, 2026 | November 12, 2026, 3:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.