Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE

Closed. Responses were due November 3, 2026, 11:00 PM ET.

Solicitation numberW90VN626QA017
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, 0906 AQ CO CONTRACTING BAT
Set-asideNot listed
NAICS332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
SBA size standard: 750 employees
Product or service code2510 Vehicular Cab, Body, and Frame Structural Components
Place of performance96278
PostedOctober 25, 2026
Response dueNovember 3, 2026, 11:00 PM ET

Who holds the work now

Largest current award in NAICS 332999 at the Department of the Army, by dollars obligated: CANADIAN COMMERCIAL CORPORATION, current end date April 30, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W90VN626QA017 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The amendment 0003 is issued to extend the closing date from 26 OCT 2026 to 4 NOV 2026, 1300 Hrs (KST).// The amendment 0002 is issued to extend the closing date from 15 OCT 2026 to 29 OCT 2026, 1300 Hrs (KST). //The amendment 0001 is issued to extend the closing date from 1 OCT 2026 to 15 OCT 2026, 1300 Hrs (KST). //This pre solicitation is conducted under the logistic cost sharing (LCS) program. The Government anticipates issuing a solicitation for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems and associated Access Control Point (ACP) control systems at the Morin and Main Gates, Osan Air Base, Republic of Korea (ROK). Under this commercial acquisition, the Contractor shall be responsible for the demolition, removal, and disposal of existing AVBs; executing all necessary foundation, civil, and electrical site work; and performing the complete installation, point-to-point wiring, and power integration of the newly furnished equipment. Additionally, the Contractor must execute complex Programmable Logic Controller (PLC) reprogramming and system integration across multiple gatehouses, overwatch booths, vehicle inspection centers, traffic lights, and communication enclosures to achieve a fully synchronized, fail-safe ACP operation capable of maintaining full security functionality under both normal and power-loss conditions. The Performance Work Statement (PWS) containing all specific technical, execution, and commissioning requirements is attached for upcoming solicitation.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationAugust 19, 2026August 30, 2026, 8:00 PM ET
SolicitationAugust 30, 2026October 1, 2026, 12:00 AM ET
SolicitationSeptember 29, 2026October 15, 2026, 12:00 AM ET
SolicitationOctober 13, 2026October 29, 2026, 12:00 AM ET
SolicitationOctober 25, 2026November 3, 2026, 11:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.