Notices · Solicitation

FTW506 Life Safety Repairs

Closed. Responses were due June 25, 2026, 6:00 PM ET.

Solicitation numberW911KB26RA039
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W2SN ENDIST ALASKA
Set-asideSmall Business Set Aside - Total (SBA)
NAICS238210 Electrical Contractors and Other Wiring Installation Contractors
SBA size standard: $19M average annual receipts
Product or service codeY1BZ Construction of Other Airfield Structures
Place of performanceNot listed
PostedJuly 27, 2026
Response dueJune 25, 2026, 6:00 PM ET

Who holds the work now

Largest current award in NAICS 238210 at the Department of the Army, by dollars obligated: M. C. DEAN, INC., current end date January 27, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W911KB26RA039 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

This is a solicitation notice for a total small business set aside design build Request for Proposal (RFP) to install power on the southeast of Hangar 1 to accommodate the Black Hawk Aircrew Trainer (BAT) and the Transportable Flight Procedure Simulator (TFPS) including the ECU units for each device. Electrical requirements for each device are: two 120/208v, 200 amp, 60Hz, three phase, 4 wire plus ground services with MS980555C52412S or MS90555C52143S receptacles. The project will connect Simulators to the Fire Alarm System, converting bay areas to a wet pipe sprinkler system, and correct egress deficiencies and other life safety repairs needed to ensure life safety including code required egress/emergency lighting and the like. Finally, the project will also install expanded metal mesh in a prefab arms vault that was installed in the structural repair project (FTW433) to be in compliance with AR190-11 Tab G to be used as an Arms Room. Updates to the existing fire system to meet current building codes may be required. This building has been identified as a historical building. Coordination with the SHPO will be required to ensure project will not violate any laws or regulations. The construction cost limitation for this requirement is $18,000,000. The performance period will be approximately 600 calendar days.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationMay 25, 2026June 25, 2026, 6:00 PM ET
SolicitationJune 22, 2026June 25, 2026, 6:00 PM ET
SolicitationJuly 27, 2026June 25, 2026, 6:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.