Notices · Solicitation
Port of Nome Modification - Phase 2
Open. Responses are due in 20 days, on December 17, 2026, 6:00 PM ET.
| Solicitation number | W911KB27BA004 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W2SN ENDIST ALASKA |
| Set-aside | Not listed |
| NAICS | 237990 Other Heavy and Civil Engineering Construction SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2) |
| Product or service code | Y1KF Construction of Dredging Facilities |
| Place of performance | 99762 |
| Posted | November 16, 2026 |
| Response due | December 17, 2026, 6:00 PM ET |
Who holds the work now
Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W911KB27BA004 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
Project Title: Port of Nome Modification - Phase 2 Project Location: Nome, Alaska NAICS: 237990, Size Standard: $37,000,000 Full and Open Competition Invitation for Bid with Definitive Responsibility Criteria DPAS Rating: DO-C2, Refer to Clause FAR 52.211-15, Defense Priority and Allocation Requirements Description of Work: The Port of Nome Modification - Phase 2 project consists of unclassified dredging to establish a new deepwater basin and expand the existing outer basin at the Port of Nome. The base item includes dredging approximately 578,000 cubic yards of material at a design depth of -40 feet MLLW with a 2.0-foot allowable dredging tolerance (overdepth) establishing a maximum pay line of -42.0 feet MLLW. The option item includes dredging approximately 346,000 cubic yards to a design depth of -28 feet MLLW, with a 1.0-foot allowable dredging tolerance establishing a maximum pay line of -29.0 feet MLLW. Dredging will occur directly against the newly constructed Opencell sheet pile docks. All dredged material will be placed in a designated nearshore placement area. The contractor shall comply with commercial and industry standards as well as all applicable federal, state, and local laws, regulations, and procedures. The type of contract shall be firm-fixed price. Construction Wage Rates (formerly Davis-Bacon Act wage rates) shall apply.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Presolicitation | November 1, 2026 | |
| Presolicitation | November 1, 2026 | |
| Solicitation | November 16, 2026 | December 17, 2026, 6:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.