Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Combined Synopsis/Solicitation

EE-24021-4J MLC Load Rating Calculation-Non-Reportable Bridges

Closed. Responses were due July 23, 2026, 3:00 PM ET.

Solicitation numberW911S226RA012
Notice typeCombined Synopsis/Solicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W6QM MICC-FT DRUM
Set-asideSmall Business Set Aside - Total (SBA)
NAICS541330 Engineering Services
SBA size standard: $25.5M average annual receipts; exception for Military and Aerospace Equipment and Military Weapons: $47M average annual receipts; exception for Contracts and Subcontracts for Engineering Services Awarded Under the National Energy Policy Act of 1992: $47M average annual receipts; exception for Marine Engineering and Naval Architecture: $47M average annual receipts
Product or service codeC1LB Architect and Engineering- Construction: Highways, Roads, Streets, Bridges, and Railways
Place of performance13602
PostedJuly 8, 2026
Response dueJuly 23, 2026, 3:00 PM ET

Who holds the work now

Largest current award in NAICS 541330 at the Department of the Army, by dollars obligated: BAE SYSTEMS LAND & ARMAMENTS L.P., current end date May 14, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W911S226RA012 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

Amendment 0002 Extends the response date an additional two weeks to 23 July 2026. Amendment 0001 adds Attachment 2 - Requests for Information, please see the highlighted changes. The Mission and Installation Contracting Command ? Fort Drum is procuring Architect?Engineer (A E) Design Services to Perform MLC Load Rating Calculation-Non-Reportable Bridges at Fort Drum NY. This procurement is conducted under the Brooks Architect?Engineer Act (40 U.S.C. 1102) and FAR Subpart 36.102, which require that A E contracts be negotiated on the basis of demonstrated competence and qualifications for the required professional services. The selected A-E firm will complete new load rating calculations using the Load and Resistance Factor Rating (LRFR) Specifications for all non-reportable Fort Drum bridges.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationJune 22, 2026July 7, 2026, 3:00 PM ET
Combined Synopsis/SolicitationJune 30, 2026July 7, 2026, 3:00 PM ET
Combined Synopsis/SolicitationJuly 8, 2026July 23, 2026, 3:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.