Notices · Combined Synopsis/Solicitation
RFQ - 12.5-Ton Gas/Electric Rooftop Unit Package
Closed. Responses were due May 28, 2026, 3:30 PM ET.
| Solicitation number | W911S226U3282 |
|---|---|
| Notice type | Combined Synopsis/Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W6QM MICC-FT DRUM |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 333415 Air‑Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing SBA size standard: 1,250 employees |
| Product or service code | 4120 Air Conditioning Equipment |
| Place of performance | 21702 |
| Posted | May 19, 2026 |
| Response due | May 28, 2026, 3:30 PM ET |
Who holds the work now
Largest current award in NAICS 333415 at the Department of the Army, by dollars obligated: BERG MANUFACTURING, INC., current end date September 30, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W911S226U3282 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
Amended to change NAICS code. This requirement is for a complete, like-for-like replacement of an existing commercial rooftop unit, or RTU. The required equipment package must meet or exceed the following specifications. The base unit must be one 12.5-Ton Gas Heat and Electric Cooling Rooftop Unit with a 208-volt, 3-phase power supply. The unit must have single circuit, two-stage cooling with a minimum 10.8 EER or 15.0 IEER, and two-stage medium gas heat with a first stage of 180 MBH input and a second stage of 224 MBH input. It must also feature a high-static direct-drive vane axial fan, such as a Carrier EcoBlue or equivalent, and use a modern, low GWP refrigerant like R-454b. The package must also include the following compatible accessories: one Vertical Economizer with a controller, one Enthalpy sensor and harness for the economizer, and one standalone, two-stage programmable thermostat.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Combined Synopsis/Solicitation | May 18, 2026 | May 28, 2026, 3:30 PM ET |
| Combined Synopsis/Solicitation | May 19, 2026 | May 28, 2026, 3:30 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.