Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Combined Synopsis/Solicitation

Air Curtain Ash Rake

Closed. Responses were due May 28, 2026, 4:00 PM ET.

Solicitation numberW911S226U3336
Notice typeCombined Synopsis/Solicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W6QM MICC-FT DRUM
Set-asideSmall Business Set Aside - Total (SBA)
NAICS333413 Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SBA size standard: 500 employees
Product or service code4210 Fire Fighting Equipment
Place of performance76544
PostedMay 27, 2026
Response dueMay 28, 2026, 4:00 PM ET

Who holds the work now

Largest current award in NAICS 333413 at the Department of the Army, by dollars obligated: HDT EXPEDITIONARY SYSTEMS INC, current end date September 30, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W911S226U3336 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

2026 or 2027 new air curtain ash rake compatible for the Air Burners S327 Air Curtain. CONSTRUCTION: Material - High carbon steel rake head with reinforced welds; Handle -Heavy gauge steel tubular handle; Heat Rating - Suitable for continuous exposure to 1,600?2,000?F chamber temperatures; Finish - Industrial high temp black oxide or heat resistant coating. DIMENSIONS: Overall Length: 72?96 inches (6?8ft), Rake Head Width: 12?16 inches, Rake Head Thickness: 1/4in ? 3/8in plate steel, Handle Diameter: 1?1.25in WEIGHT: Approx. 12?18lbs, depending on length and head configuration. FUNCTIONAL USE - PRIMARY FUNCTIONS: Ash leveling during active burns, pulling unburned material toward the combustion zone, clearing burn chamber floor after shutdown, managing hot coals to maintain optimal burn efficiency, assisting with chamber clean out before next operational cycle. OPERATIONAL COMPATIBILITY -DESIGNED FOR USE WITH: Fire Box S Series (S111, S220, S327, S330, S460, etc.), Fire Box skid mounted and trailer mounted units, Air Curtain Destructor (ACD) military variants. SAFETY and COMPLIANCE - SAFETY FEATURES: Extended handle length for operator standoff distance, heat resistant construction to prevent tool failure, reinforced rake head to withstand heavy debris loads. Option - The optional ash clean-out implement with a blank 1in steel faceplate, for welding on a future connection supplied by the buyer. Final price shall include shipping to Ft Hood TX 76544.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationMay 27, 2026May 28, 2026, 4:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.