Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Combined Synopsis/Solicitation

Rail Spanners

Closed. Responses were due August 14, 2026, 2:00 PM ET.

Solicitation numberW911S226U3919
Notice typeCombined Synopsis/Solicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W6QM MICC-FT DRUM
Set-asideSmall Business Set Aside - Total (SBA)
NAICS336510 Railroad Rolling Stock Manufacturing
SBA size standard: 1,500 employees
Product or service code2240 Locomotive and Rail Car Accessories and Components
Place of performance76544
PostedAugust 6, 2026
Response dueAugust 14, 2026, 2:00 PM ET

Who holds the work now

Largest current award in NAICS 336510 at the Department of the Army, by dollars obligated: S & S FOREST PRODUCTS, LLC, current end date February 27, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W911S226U3919 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

Minimum 72 inch long x 24 inch wide and no more than 4 inch thick. Minimum weight per single spanner 20,000lbs (40,000lbs per pair/axle) total weight minimum of each spanner is 78lbs EA. Rated capacity shall be no more than 50% of failure strength (at least a 2-to-1 safety factor). Failure strength is determined by the amount of weight that causes permanent deformation of the aluminum. Meaning that an 80,000 axle can be placed on a pair of spanners before any permanent deformation of aluminum appears. Minimum structure tubes 3 inch x3 inch and no more than 4 inch x4 inch. Top surface of spanner will be composed of maximum 2 inch wide high-traction rungs. The rungs shall be spaced no more than 4 inch to allow tiedown chains or straps to be routed between the rungs and over the structural tubes also spacing allows for debris to fall through. Must have reinforced kickplate on one side to rest on flat/ unobstructed surface. Minimum 12 inch heavy duty reinforced stub toe on each end: taper to 2 inch blunt end, knife end not acceptable, Each spanner must be etched with part number and capacity.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationAugust 6, 2026August 14, 2026, 2:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.