Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Combined Synopsis/Solicitation

Commercial Grade Dust Collector System

Closed. Responses were due September 7, 2026, 4:00 PM ET.

Solicitation numberW911S226U4220
Notice typeCombined Synopsis/Solicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W6QM MICC-FT DRUM
Set-asideSmall Business Set Aside - Total (SBA)
NAICS333413 Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SBA size standard: 500 employees
Product or service code5915 Filters and Networks
Place of performance98433
PostedAugust 30, 2026
Response dueSeptember 7, 2026, 4:00 PM ET

Who holds the work now

Largest current award in NAICS 333413 at the Department of the Army, by dollars obligated: HDT EXPEDITIONARY SYSTEMS INC, current end date September 30, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W911S226U4220 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

Amendment 0002. Need to add: must include Puget Sound Clean Air Agency notice of construction permit. Because of this, extending the solicitation for a week. Amended to add set aside code. Shaker filter / baghouse style dust collection system capable of allowing multiple high-demand machines (belt sanders, CNC routers, planers, saws) to run simultaneously without starving the system of static pressure and provide 99.9% pure air return into facility. Must be able to retrofit into ductwork from a 2006 Murphy-Adams Shaker Style dust collection system (model MRSE-20-6D) for a 5,000 square foot facility. Installation, electrical components, and air compression (as needed) requested for inclusion in the total cost. CFM requirements based on attached ductwork schematic. Must meet federal and Washington State environmental requirements. Delivery and installation required.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationAugust 20, 2026August 28, 2026, 6:55 PM ET
Combined Synopsis/SolicitationAugust 23, 2026August 28, 2026, 6:55 PM ET
Combined Synopsis/SolicitationAugust 30, 2026September 7, 2026, 4:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.