Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Combined Synopsis/Solicitation

ASBESTOS AND LEAD ABATEMENT FOR WEST VIEW DFAC

Closed. Responses were due January 21, 2026, 10:00 AM ET.

Solicitation numberW911WN26QA015
Notice typeCombined Synopsis/Solicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W072 ENDIST PITTSBURGH
Set-asideSmall Business Set Aside - Total (SBA)
NAICS562910 Remediation Services
SBA size standard: $25M average annual receipts; exception for Environmental Remediation Services: 1,000 employees (SBA footnote 14)
Product or service codeF108 Environmental Systems Protection- Environmental Remediation
Place of performance15229
PostedJanuary 15, 2026
Response dueJanuary 21, 2026, 10:00 AM ET

Who holds the work now

Largest current award in NAICS 562910 at the Department of the Army, by dollars obligated: SEVENSON ENVIRONMENTAL SERVICES, INC., current end date September 11, 2032. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W911WN26QA015 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The U.S. Army Corps of Engineers, Pittsburgh District, requires a contractor to perform asbestos-containing material (ACM) and lead-based paint abatement at the West View Dining Facility (DFAC) located at 100 Valley Hi Drive, Pittsburgh, PA. The contractor shall remove and dispose of approximately 175 linear feet of asbestos pipe insulation, 12 square feet of asbestos flue insulation, 1,440 square feet of asbestos floor tile and mastic, and 1,000 square feet of cementitious panels. Additionally, lead-based paint will be abated from approximately 2,800 square feet of exterior surfaces and 4,800 square feet of interior surfaces, including walls, doors, windows, and ceilings, with inspection and abatement of 200 square feet in the boiler room. The contractor will apply encapsulating sealants and a finish coat of paint to the treated areas, decontaminate all personnel and equipment, and transport waste to an EPA-approved disposal facility. The work must comply with all applicable OSHA, EPA, and Army regulations, including 40 CFR Part 61 (NESHAP), OSHA asbestos and lead standards, and EM 385-1-1 safety requirements. The project must be completed within 60 calendar days from issuance of the Notice to Proceed, with work conducted during normal business hours.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationJanuary 5, 2026January 16, 2026, 10:00 AM ET
Combined Synopsis/SolicitationJanuary 13, 2026January 16, 2026, 10:00 AM ET
Combined Synopsis/SolicitationJanuary 14, 2026January 16, 2026, 10:00 AM ET
Combined Synopsis/SolicitationJanuary 15, 2026January 21, 2026, 10:00 AM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.