FY25 Ludington and Pentwater Maintenance Dredging

Closed. Responses were due March 20, 2026, 2:00 PM ET.

Solicitation numberW911XK26BA011
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W072 ENDIST DETROIT
Set-asideSmall Business Set Aside - Total (SBA)
NAICS237990 Other Heavy and Civil Engineering Construction
SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2)
Product or service codeY1KF Construction of Dredging Facilities
Place of performanceNot listed
PostedMarch 22, 2026
Response dueMarch 20, 2026, 2:00 PM ET

Who holds the work now

Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W911XK26BA011 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

***Posting of the bid abstract.***Amendment 0001 is issued to provide revised Plan Sheets CN101 and CN102. Reference amendment documents for full details.***FY25 Ludington and Pentwater Maintenance Dredging. Mobilize to Ludington Harbor and Pentwater Harbor and dredge between the upstream and downstream limits as shown on the contract drawings. Place dredged material at respective placement sites pertaining to each harbor, as outlined in the contract drawings and specifications. If applicable option(s) are exercised, re-mobilize to Pentwater Harbor in 2027 and dredge between the upstream and downstream limits as shown on the contract drawings. Upon completion of the work, clean-up and demobilize from the harbors. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.

Attachments

SAM.gov lists 1 file with this notice. Open it on SAM.gov, or ask Claude to read it.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationFebruary 17, 2026March 20, 2026, 2:00 PM ET
SolicitationMarch 10, 2026March 20, 2026, 2:00 PM ET
SolicitationMarch 22, 2026March 20, 2026, 2:00 PM ET
SolicitationMarch 22, 2026March 20, 2026, 2:00 PM ET
SolicitationMarch 22, 2026March 20, 2026, 2:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.