Monroe Harbor Advanced Maintenance Dredging

Closed. Responses were due January 21, 2026, 2:00 PM ET.

Solicitation numberW911XK26BA013
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W072 ENDIST DETROIT
Set-asideSmall Business Set Aside - Total (SBA)
NAICS237990 Other Heavy and Civil Engineering Construction
SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2)
Product or service codeY1KF Construction of Dredging Facilities
Place of performance48162
PostedJanuary 27, 2026
Response dueJanuary 21, 2026, 2:00 PM ET

Who holds the work now

Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W911XK26BA013 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

***Posting of Bid Abstract***Monroe Harbor Advanced Maintenance Dredging - The project requirements include: Mobilize dredge to Monroe Harbor. Monroe Harbor will be mechanically dredged due to the character of materials (boulders, rocks, and more clay-like material) within the harbor. Dredged material placement method is unrestricted. The harbor will be dredged to a depth of 23-ft below Low Water Datum (LWD) plus 1-ft overdepth or point of refusal, whichever is less, within the main channel for STA 60+00 to 76+00, 0+00 to 20+00 river and 0+00 to 20+00 lake. From STA 15+75 to 4+00, a section near the wall will be dredged to 20 ft below LWD plus 1-ft overdepth or point of refusal, whichever is less. The turning basin will be dredged to a depth of 20-ft below LWD plus 1-ft overdepth or point of refusal, whichever is less, for STA 64+72 to 79+00. Placement of dredged material will be in Cell 3 at Pointe Mouillee Confined Disposal Facility (CDF). No discharge is allowed at Pointe Mouillee CDF. Demobilize when dredge work is complete.

Attachments

SAM.gov lists 1 file with this notice. Open it on SAM.gov, or ask Claude to read it.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationDecember 16, 2025January 21, 2026, 2:00 PM ET
SolicitationJanuary 27, 2026January 21, 2026, 2:00 PM ET