Notices · Solicitation
USACE SPK Construction - Natomas PP5, Sacramento, CA
Closed. Responses were due September 29, 2026, 12:00 PM ET.
| Solicitation number | W9123826BA012 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W075 ENDIST SACRAMENTO |
| Set-aside | Not listed |
| NAICS | 237990 Other Heavy and Civil Engineering Construction SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2) |
| Product or service code | Y1LC Construction of Tunnels and Subsurface Structures |
| Place of performance | Not listed |
| Posted | September 29, 2026 |
| Response due | September 29, 2026, 12:00 PM ET |
Who holds the work now
Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W9123826BA012 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
***Abstract of Offers has been posted, see attchments*** *** Amendment 0004 has been issued ****** Amendment 0003 has been issued****** Amendment 0002 has been issued****** Amendment 0001 has been issued ***The United States Army Corps of Engineers (USACE) Sacramento District (SPK) is issuing a solicitation for the requirement to construct a new pumping plant facility in Sacramento, CA. The American River Common Features, Natomas Basin Project was authorized by the Water Resources Reform Development Act of 2014. The Natomas Basin is divided into nine reaches, A through I. Pumping Plant 5 (PP5) is in Reach B, located along the Sacramento River near the landside toe of the levee and south of Interstate 5. PP5 is designed to discharge drainage from the West Drainage Canal to the Sacramento River following any significant amount of rainfall. The existing PP5 is in the path of completing the Reach B levee improvements that includes seepage berm, adjacent levee, and raising discharge pipes above the 200-year water surface elevation. The existing PP5 will be demolished, and a new facility will be constructed about 300 feet up the canal to allow for the levee features to be constructed .Point of Contact: Antonina Beal, Contract Specialist. Email: Antonina.Beal@usace.army.mil. Please refer to the full solicitation document for all detailed instructions, clauses, and submission requirements.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | July 30, 2026 | September 1, 2026, 12:00 PM ET |
| Solicitation | August 5, 2026 | September 1, 2026, 12:00 PM ET |
| Solicitation | August 5, 2026 | September 1, 2026, 12:00 PM ET |
| Solicitation | August 12, 2026 | September 1, 2026, 12:00 PM ET |
| Solicitation | August 17, 2026 | September 29, 2026, 12:00 PM ET |
| Solicitation | September 9, 2026 | September 29, 2026, 12:00 PM ET |
| Solicitation | September 29, 2026 | September 29, 2026, 12:00 PM ET |
| Solicitation | September 29, 2026 | September 29, 2026, 12:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.